Choosing A Location - Teledyne 7600 Operating Instructions Manual

Ndir infrared gas analyzer
Hide thumbs Also See for 7600:
Table of Contents

Advertisement

Installation
* These optional items are included if specified at the time of purchase
As soon as you receive the instrument, carefully unpack and inspect
the analyzer and components for damage. Immediately report any
damage to the shipping agent. The analyzer is shipped with all the
materials you need to install and prepare the system for operation.

2.2 Choosing a Location

CAUTION:
THIS UNIT IS NOT EXPLOSION-PROOF. DO NOT
INSTALL IT IN A LOCATION WHERE EXPLOSIVE OR
FLAMMABLE GASES ARE PRESENT.
Select an installation location that meets the following criteria:
• This instrument should be rack mounted, or mounted in a
steel enclosure.
• Indoor location.
• Vibration-free.
• Not exposed to direct sunlight.
• Clean and non-cluttered space.
• Depending on the options selected at the time of purchase,
the model 7600 requires an AC power source of 100V to
240V AC.
• Operating voltage: 85V to 264V AC
• Rated frequency: 50/60 Hz
• Power consumption: 250 VA max.
• Plug: Comformity to EN60320 class I type 3-pin inlet
• Operation conditions:
• Ambient temperature: -5° to 45°C
• Ambient humidity: 90 % RH or less, no condensation
Teledyne Analytical Instruments
Model 7600
22

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents