Installation; Unpacking The Analysis Unit; Mounting The Analysis Unit - Teledyne 2010B Operating Instructions Manual

Thermal conductivity analyzer
Table of Contents

Advertisement

Thermal Conductivity Analyzer
Installation of the Model 2010B Analyzer includes:
1. Unpacking, mounting, and interconnecting the Control Unit and
2. Making gas connections to the system
3. Making electrical connections to the system
4. Testing the system.
2.1
The analyzer is shipped with all materials needed to install and prepare the
system for operation. Carefully unpack the Analysis Unit and inspect it for
damage. Immediately report any damage to the shipping agent.
2.2
The Model 2010B Analysis Unit is for use in Class 1, Division 1,
Groups C and D, hazardous environments (group B available). The actual
class is limited by the flame arrestor option.
The standard model is designed for bulkhead mounting. Overall dimen-
sions of the Analysis Unit will vary depending on options. The maximum
footprint will be 19
at the back of this manual, gives the correct mounting dimensions for your
unit.
Note: The housing, including the cover, protrudes 8.6 to 9.4 inches
from the base on which it is mounted. Enough clearance is
required in front of the cover to allow the cover to be re-
moved.
Figure 3-1 is a view with the cover removed showing the external Gas
Connector Panel and the internal Electrical Connector Panel.

Installation

the Analysis Unit

Unpacking the Analysis Unit

Mounting the Analysis Unit

12 , and maximum height 9.4 . An Outline Drawing
Teledyne Analytical Instruments
Part II: Analysis Unit
Part II: 2-1

Advertisement

Table of Contents
loading

Table of Contents