Removing And Replacing The Cell Block - Teledyne 2000A-EU Operating Instructions Manual

Thermal conductivity analyzer
Table of Contents

Advertisement

5 Maintenance
b. Remove analyzer from its mounting, and remove gas fittings
from the gas ports on the bottom of the analyzer, so that nothing
projects from the ports.
c. Remove the Cell Compartment retaining screws identified in
Figure 5-5. You will have to unlatch and swing open the front
panel door to remove the front screws.
d. Carefully pull the Cell Compartment out through the front of the
analyzer. There is enough length to the cell's electrical wiring to
allow this.
e. After replacing the necessary component and reassembling the
Cell Compartment, Replace the Compartment by reversing the
above procedure, steps a through d.

5.6.2 Removing and Replacing the Cell Block

a. Refer to Figure 5-6, which illustrates removal of the Cell Block
from the Cell Compartment. Exploded view is as seen from the
top of the Cell Block.
Figure 5-6: Removal of Cell from Cell Housing
b. Remove the two screws holding the front mounting bracket—
they also hold the Cell Block Cover to the Cell Block—and then
pull off the cover.
5-6
Teledyne Analytical Instruments
Model 2000A-EU

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents