2.1

Steps in Creating Project Engineering Data

To create the project engineering data, you use the SIMATIC NCM PC or SIMATIC
STEP 7 tool.
Why do we need project engineering data?
To allow the device networked in a plant to communicate, the devices must be
supplied with data on the components and the communication connections. Before
devices can go over to productive operation, the project engineering data must first
be created and loaded on the devices.
This project engineering includes not only the PLC such as SIMATIC S7 stations
but also the PC stations so that the communication relations between all devices of
the plant can be specified. This makes a consistency check and synchronization of
the elements of the system possible.
Apart from specifying the PLC and PC stations and their properties on the LAN,
project engineering also includes defining communication connections and
symbols for process variables on the OPC server.
Result
Once the project engineering data have been downloaded to or imported into the
PC station, the applications can communicate over the established communication
networks with the stations accessible over the network.
Initial Situation
S Case a) Initial configuration using remote configuration with STEP7 / NCM PC
To be able to make the initial configuration on the PC station (available online)
in the next step, you must first create the project engineering data for the PC
station with NCM PC / STEP 7.
S Case b) An XDB file for initial configuration is available
To be able to make the initial configuration in the next step, you must first
create the project engineering data for the PC station with NCM PC / STEP 7
and then make this data available in an XDB file.
S Case c) The initial configuration has already been made on the PC station
Project engineering data is downloaded or imported as an XDB file following
initial configuration.
Commissioning PC Stations - Manual and Quick Start
Release 5/2005
C79000-G8976-C156-07
2 Getting Started "Configured Mode"
27