Siemens SIMATIC NET Manual page 85

Commissioning pc stations
Hide thumbs Also See for SIMATIC NET:
Table of Contents

Advertisement

3.
Click the "Select" button.
Result: The "Use Symbols" dialog opens. In this dialog, you can specify which symbols you
want to use and can configure them.
Confirm the dialog with "OK".
Also confirm the properties dialog of the OPC server with "OK".
4.
Result: You return to HW Config.
All the symbols specified in the STEP 7 project engineering are available in the OPC server.
5.
Save and compile the project with the Station
select the option "Compile and check everything" to update the information in the project.
Close HW Config.
6.
Commissioning PC Stations - Manual and Quick Start
Release 5/2005
C79000-G8976-C156-07
7 Example — OPC Application for Industrial Ethernet
Activity
"
Save and Compile menu command and
85