13 SIMATIC NCM PC Project Engineering Tool
3.
Repeat these steps for all submodules.
4.
Save and compile the configuration.
13.8.2
Configuration with a "Third- party" DP Master
DP master system for configuring the DP slave
If the DP master engineering cannot be done in NCM / STEP 7, however you want
to engineer the PC station used DP slave in NCM / STEP 7, you will have to create
a substitute DP master with a DP master system in the S7 project. This can be a
PC station as already described in this chapter or a SIMATIC S7 station.
Create this substitute master in the project engineering just like a real DP master.
You then simply require the project engineering data for the DP slave.
Supplying the DP master with data from the GSD file
The real DP master is supplied with the configuration data of the DP slave from a
GSD file.
182
Follow the steps outlined below:
Commissioning PC Stations - Manual and Quick Start
Release 5/2005
C79000-G8976-C156-07

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Simatic net commissioning pc stations

Table of Contents