4 4
Electrical Wiring
X1
Lamp
Projector
S7
M
Motor
Hot Line
NEMA-5 IEC 320 C13/C14
Ground
Neutral
Branch Circuit
Heater-Blower
5 5
Service Instructions
WARNING! Disconnect power at circuit breaker before at-
tempting any maintenance or cleaning to reduce the risk of
fi re, electrical shock or personal injury.
A. Replacing the Light Bulb
This appliance uses a single 12 Volt, 35 Watt, MR-16 bulb.
The bulb is located behind the smoke shield.
A spare is provided with the unit. Replacement bulbs (Part
No. 4050-123) are available through your Simplifyre dealer.
•
Turn off power to the unit at the main service panel.
•
Let the fi replace cool if it has been operating.
•
Release the spring pins and remove the upper shield.
•
Remove the two screws on the projector basket.
•
Rotate the housing down to access the bulb.
•
Remove the screws holding the bulb and socket.
•
Unplug the bulb from the socket.
•
Replace the bulb.
•
Re-assemble in the reverse order.
7
Hearth & Home Technologies Inc. • Plug & Play • 4050-317 Rev A • 04/08
Interlock on
Media Cabinet only
Power Supply Module
12 VOC
J1
Power
Supply
Hi Limit
Heater
M
Motor
Remote Receiver
Flame
P1
Heat
Ember Bed & Back Log
R2
LED LED LED
D1
R1
LED LED LED
Heat Indicator
B. Screen Cleaning
During shipment, installation, handling, etc., the screen
surface may collect dust particles; these can be removed
by lightly wiping with a clean, dry cloth.
C. Maintenance of Motors
The motors used on the fan and fl ame projector assembly
are pre-lubricated for extended bearing life and require no
further lubrication. However, periodic cleaning/vacuuming of
the fan/heater unit is recommended.
D. Resetting the Temperature Cutout Switch
The heater on this fi replace is protected with a safety
device to prevent overheating. Should the heater overheat,
an automatic cutout will turn OFF the heater/blower. The
switch is reset by turning the unit OFF, waiting 10-15
minutes and switching the unit back ON.
RD
Flame
4050-309
Terminal Strip
Wall Switch
ON
1
Heat
WH
WH
RD
5
4050-310
Wall Thermostat