Modifying Backup Specifications; Scheduling Backup Specifications; Scheduling Example - HP Data Protector A.06.11 Integration Manual

For oracle and sap
Hide thumbs Also See for Data Protector A.06.11:
Table of Contents

Advertisement

Option
Objects outside
database
NOTE:
The total number of sapback processes started in one session using Data Protector is
limited to 256.

Modifying backup specifications

To modify your backup specification, click its name in the Scoping Pane of the Backup
context, then click the appropriate tab, and apply the changes.

Scheduling backup specifications

You can run unattended backups at specific times or periodically. For details on
scheduling, see the online Help index: "scheduled backups".

Scheduling example

To schedule Full backups at 8:00, 13:00, and 18:00 during week days:
1.
In the Schedule property page, select the starting date in the calendar and click
Add to open the Schedule Backup dialog box.
2.
Under Recurring, select Weekly. Under Time options, select 8:00. Under Recurring
Options, select Mon, Tue, Wed, Thu, and Fri. See
Click OK.
3.
Repeat
13:00 and 18:00.
4.
Click Apply to save the changes.
190
Integrating SAP R/3 and Data Protector
Description
Specifies non-database files of the Oracle SAP R/3 environment
to be saved.
Save these files in a separate backup session.
Step 1
on page 190 and
Figure 38
Step 2
on page 190 to schedule backups at
on page 191.

Advertisement

Table of Contents
loading

Table of Contents