1=
Install transition on top of hood (if removed for shipping) with
4 - 3.5 x 9.5 mm sheet metal screws.
Electrical Shock Hazard
Disconnect power before servicing.
Replace all parts and panels before operating.
Failure to do so can result in death or electrical shock.
A. Vent transition
B. 3.5 x 9.5 mm screw
For vented installations only:
1. Fit vent system over transition piece.
2. Seal connection with clamps.
3. Check that backdraft dampers work properly.
For non-vented
(recirculating)
installation
only:
1. Fit vent system over deflector and transition piece.
A. Deflector
B. Vent system
C. Vent transition
2. Seal connection with clamps.
3. Check that backdraft dampers work properly.
1=
2.
3.
4=
5=
Disconnect
power.
Remove terminal box cover.
Remove the knockout in the terminal box cover and install a
UL listed or CSA approved V2"strain relief.
Run 3 wires, black, white and green (14AWG), in V2" conduit
from service panel to terminal box. Use caulking to seal
opening.
S
..........................
A
_
C
......
D
/
E
F
A. UL listed or CSA approved strain relief
B. Home power supply cable
C. Terminal box
D. Black wires
E. Green (or bare) wire connected to yellow-green wire
F. White wires
Use UL listed wire connectors
and connect black wires (D)
together.