Assembly Of The Blower - Husqvarna 125BT Operator's Manual

Hide thumbs Also See for 125BT:
Table of Contents

Advertisement

ASSEMBLY
B
C
E
/
/
Q
F
/
t
Assembly
of the blower
I.
Connect the flexible hose (A) to the
fan's outlet tube (B) with a hose
clamp.
2.
Connect the operating robe (C) to the
flexible hose with a hose clamp.
3.
Fit the control handle (D) on the
operating tube (C).
4.
Connect the intermediate
tube (E)
and air nozzle (F). Push the tubes
together and turr_tbem so that they
lock together.
NOTE!
The opel:ating tube can be turned round
its axis to direct the air jet.
"I 3 - English

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents