Assembly; Operation - Husqvarna DB110 Operator's Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
manual. Speak to your servicing
dealer for all other repairs,
maintenance and servicing.
Before you operate the product,
make sure that there is no
blockage to the air intake.
Introduction
WARNING:
safety chapter before you assemble the
product.
To install the storage hook on the wall
Install the storage hook indoors.
Keep the storage hook out of sunlight and in ambient
temperature of -10°C to 70°C.
Install the storage hook on a drywall, wood or
concrete wall.
CAUTION:
can hold loads of minimum 30 kg.
To use the attachment
Note:
Think about persons near your work area and
do not operate the product at bad times, for example
late in the evening or early in the morning. To decrease
the noise levels, limit the number of equipment units that
operate at the same time. Obey the instructions to keep
the noise levels to persons near your work area to a
minimum.
Use a rake or a brush to loosen the waste on the
ground.
When you clean corners, start in the corner and
move out. This prevents that unwanted material is
collected and blown into your face.
To keep operation time at a minimum, spray water
on areas with dust.
10

Assembly

Read and understand the
Make sure that the wall

Operation

To prevent that the product falls
and is damaged, do assembly
and installation near the ground.
Install the storage hook on the wall with the 3 screws
(A). Use wall plugs (B) if it is necessary. (Fig. 23)
CAUTION:
screws are applicable for your wall type.
Speak to your Husqvarna service agent for
information about available storage accessories for
your product.
To hang the pole blower on the storage
hook
Hang the pole blower attachment on the storage
hook as shown in the illustration. (Fig. 24)
To decrease water consumption, use the blower as
an alternative to water hoses to clean in and around
the lawn and garden.
Be careful when you do work near plants. The force
of the air can cause damage to weaker plants.
Think about the wind direction. Operate with the
wind to make your work easier.
To use the blower to move large piles adds to
operation time and causes more noise.
Keep a good balance and a firm foothold.
Keep a clearance between the tube and ground
to prevent that the product hits the ground during
operation.
Clean up after operation. Make sure that you
have not blown waste into another garden. Discard
unwanted material in applicable waste receptacles.
Make sure that the
2201 - 005 - 26.10.2023

Advertisement

Table of Contents
loading

Table of Contents