Installingthe UpperChuteTube
Figure 20
Note: Ondecks withoutdeckwheels,hookthe retainerstrapintothe hole
provided inthe flangeonthe front-sideof the cuttingdeck.SeeFigure 21.
Figure21
Note:Whenassembling thisbaggingunit onanolderdeck,anextrawing
knob,whichisonlyneeded on installations on newdecks, w ill be left over.
Peel t he backingoff of the self-adhesive f oamstrip (721-04388) that has
beenincluded withinyourContents of Carton. A pplyit to the upperchute,
flushagainstthe flangeasshowninFigure 22.
/
Figure 22
With the grass catchercoveropen,install the upperdischarge c hutethrough
the discharge chuteopening, a sseenin Figure 23.
Figure23