HP StorageWorks 8B - FC Entry Switch Reference Manual page 16

Fc 1gb/2gb
Hide thumbs Also See for StorageWorks 8B - FC Entry Switch:
Table of Contents

Advertisement

2
Installing and Configuring the Switch
4.
Install two M5 U-type Tinnerman clips for each of the front columns of the rack in the top and
bottom positions of the three-hole EIA pattern as shown in
Figure 2-3
2-6
Installing the Tinnerman Clips
Figure
2-3.
Installation and Reference Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

SurestoreFc 1gb switch 8bFc 2gb switch 8b

Table of Contents