Last Resort Shutdown Procedure Using Offline/Reset Switch - Enterasys Gold Distributed Forwarding Engine 4G4205-72 Hardware Installation Manual

Poe modules dfe-gold series
Table of Contents

Advertisement

Overview of DFE Module Shutdown Procedure

Last Resort Shutdown Procedure Using OFFLINE/RESET Switch

To reset a DFE module without it performing an orderly shutdown routine, 
press and hold the OFFLINE/RESET switch for approximately 6 seconds. 
Pulling any DFE module out of the chassis before it has been shut down is not 
recommended. The only safe time to pull a module out of the chassis is after the 
completion of a shutdown and the management LED is flashing amber/off.
4-12 Troubleshooting
Caution: This method of shutting down a DFE module is not recommended except as a
last resort, because all processes currently running on the module will be interrupted
resulting in loss of frames.
Precaución: No se recomienda utilizar este método para apagar los módulos DFE- Gold.
Recurra a él sólo como último recurso, puesto que interrumpe todos los procesos del
módulo en funcionamiento, lo que podría resultar pérdidas de frames.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Enterasys Gold Distributed Forwarding Engine 4G4205-72 and is the answer not in the manual?

Table of Contents

Save PDF