Enterasys Gold Distributed Forwarding Engine 4G4205-72 Hardware Installation Manual page 15

Poe modules dfe-gold series
Table of Contents

Advertisement

Overview ........................................................................................................................................... C-1
Proprietary PD Detection ............................................................................................................ C-2
Power Interface .......................................................................................................................... C-2
Matrix N5 Backplane 48 Vdc Interface ....................................................................................... C-2
Front Panel 48 Vdc Interface ...................................................................................................... C-2
Front Panel 48 Vdc Interface ...................................................................................................... C-3
PoE Port Status LEDs ................................................................................................................ C-3
Figures
1-1
4G4285-49 DFE-Gold Module......................................................................................................1-4
1-2
4G4205-72 DFE-Gold Module .....................................................................................................1-6
3-1
Examples, Slot Numbers/Module Placement in Matrix E7 Chassis .............................................3-4
3-2
Installing Module into Matrix E7 or Matrix N7 Chassis (E7 shown) ............................................3-10
3-3
Installing Module into Matrix N3 or Matrix N5 Chassis (N3 shown)............................................3-12
3-4
Connecting a Twisted Pair Segment with RJ45 Connector........................................................3-15
3-5
3-6
Between Switches and End User Devices .................................................................................3-17
3-7
3-8
Between Switches and End User Devices .................................................................................3-19
3-9
Connecting an IBM PC or Compatible........................................................................................3-21
3-10
Connecting a VT Series Terminal...............................................................................................3-22
3-11
Connecting to a Modem .............................................................................................................3-24
3-12
Matrix DFE Startup Screen Example (N7 Chassis)....................................................................3-27
4-1
LANVIEW LEDs on 4G4285-49....................................................................................................4-2
4-2
LANVIEW LEDs on 4G4205-72....................................................................................................4-3
4-3
OFFLINE/RESET Switch............................................................................................................4-11
B-1
Mode Switch Location (4G4285-49 shown without safety cover)................................................ B-3
B-2
DIMM and DRAM SIMM Locations (4G4285-49 shown without safety cover) ............................ B-4
B-3
Removing the Safety Cover......................................................................................................... B-6
B-4
Removing the Network Expansion Module (NEM) ...................................................................... B-8
B-5
Removing the Existing DRAM SIMM........................................................................................... B-9
B-6
Installing the DRAM SIMM ........................................................................................................ B-10
B-7
Removing the Existing DIMM .................................................................................................... B-11
B-8
Installing the DIMM.................................................................................................................... B-12
B-9
Installing the Network Expansion Module.................................................................................. B-13
B-10
Installing the Safety Cover......................................................................................................... B-15
xiii

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Enterasys Gold Distributed Forwarding Engine 4G4205-72 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents

Save PDF