Completing The Installation - Enterasys 2H252-25R Installation & User Manual

Enterasys networks installation user's guide smartswitch 2200 2h252-25r
Hide thumbs Also See for 2H252-25R:
Table of Contents

Advertisement

Completing the Installation

3.5
COMPLETING THE INSTALLATION
After installing the 2H252-25R and any optional HSIM or VHSIM, and making the connections to
the network, proceed as follows:
1. Secure the cables by running the cables along the strain-relief bracket and tying them to the
strain-relief bracket using cable ties.
2. The 2H252-25R is now ready to be configured through Local Management. Refer to the
SmartSwitch Series 2E253, 2H252, 2H253 and 2H258 Local Management User's Guide for
information on how to access and use Local Management.
3-12
Installation

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smartswitch 2200Smartswitch 2200 2h252-25r

Table of Contents

Save PDF