Maintenance - Beisler 100/68 Operating Instructions Manual

Universal piped-pocket-sewing unit
Hide thumbs Also See for 100/68:
Table of Contents

Advertisement

15. Maintenance

Work to be done
Machine head
Remove pieces of fluff, sewing dust and thread tails from the area
around the hook and the throat plate
Supply the oiling points with oil ( see Operating Instructions chapter .. )
Check the oil level in the oil reservoir
Check the oil flow at the inspection glass
Check the hook lubrication
Clean the lenses of the bobbin thread monitor
Clean the reflected foils
Drive unit and transport carriage
Check state and tension of the V-belts and toothed belts
Pneumatic system
Check the water level in the pressure regulator
Clean the filter insert of the maintenance unit
Make leak test of the system
Optional equipment
Clean the fresh air and exhaust air filters of the suction unit (blow out)
50
Caution: Risk of injury !
Switch the main switch off.
The maintenance of the sewing unit must only be carried out when the
machine is switched off.
The daily or weekly maintenance work (cleaning and oiling) to be done
by the operators of the sewing unit is described in Part 1: Operating
Instructions. It is only listed in the following table for the sake of
completeness.
Operating hours
8
40
160
500
X
X
X
X
X
X
X
X
X
X
X
X

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents