Maintenance - Beisler 2112-5 Operating Instructions Manual

Hide thumbs Also See for 2112-5:
Table of Contents

Advertisement

Maintenance

6
This chapter describes maintenance work that needs to be carried out on
a regular basis to extend the service life of the machine and achieve the
desired seam quality.
Advanced maintenance work may only be carried out by qualified special-
ists ( Service Instructions).
Maintenance intervals
Work to be carried out
Cleaning
Cleaning the machine head
Lubricating
Lubricating the clamp rail
Servicing the pneumatic system
Adjusting the operating pressure
Draining the water-oil mixture
Cleaning the filter element
Operating Instructions 2112-5 - 00.0 - 02/2020
Maintenance
WARNING
Risk of injury from sharp parts!
Punctures and cutting possible.
Prior to any maintenance work, switch off the
machine or set the machine to threading mode.
WARNING
Risk of injury from moving parts!
Crushing possible.
Prior to any maintenance work, switch off the
machine or set the machine to threading mode.
Operating hours
8
40
160
500
51

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents