6.0 NetAXS™ Startup
6.1 LED Operation
When the panel wiring is complete, turn on the power. It might take a few minutes for
the panel to complete the power-up sequence. When the board does initialize, verify
that the appropriate LEDs identified in the following figure are in accord with the
descriptions in
Figure 34: System, Relay and Power LEDs
NetAXS Access Control Unit NX4L1 Installation Guide, Document 7-901099, Revision A
Table 7
on page 48.
Ethernet Status
LEDs
Run LED
RS485 LED
RDR 1
RDR 2
Relay Status
LEDs
NetAXS™ NX4L1 Installation
Host RS232 and
Downstream LEDs
Relay
Status
LEDs
Power
NetAXS™ Startup
RDR 3
RDR 4
47