6.0 NetAXS™ Startup

6.1 LED Operation

When the panel wiring is complete, turn on the power. It might take a few minutes for
the panel to complete the power-up sequence. When the board does initialize, verify
that the appropriate LEDs identified in the following figure are in accord with the
descriptions in

Figure 34: System, Relay and Power LEDs

NetAXS Access Control Unit NX4L1 Installation Guide, Document 7-901099, Revision A