HP D5970A - NetServer - LCII Reference Manual page 13

Rack assembly and cabling reference guide
Hide thumbs Also See for D5970A - NetServer - LCII:
Table of Contents

Advertisement

Chapter 1
WARNING
When equipment is mounted on slidies, a tip-over hazard
exists. Always take the precautions listed below:
Extend or bolt on the anti-tip foot for each rack before
mounting equipment on slides.
Never extend more than one piece of equipment on slides at a
time.
Reduce weight by removing power supplies and hard disk
drives from servers.
Always use the rack mounting handles that are shipped on
rack optimized units as shown in accompanying instructions.
4. Remove shipping panels, if present, from inside the rack enclosure. Save
panels, screws, and rack nuts if you are going to reship the rack.
6. Unpack Remaining Components
Unpack each component in the order in which you assemble them (from the
bottom of the rack upward). Each package contains rack installation instructions
or a user guide.
NOTE
If an Uninterruptible Power Supply (UPS) is included, plug it
in as soon as you unbox it. Doing so helps ensure batteries are
charged when rack installation is completed.
7. Build Basic Rack Assembly
Position, Tie Together, and Open Up the Rack
1. Determine how rack bays are to be positioned. If two or more racks are to
be tied together, use the optional tie-together kit. Otherwise, skip this step.
Newer models may be tied together before or after equipment is mounted
in them. Follow instructions included with tie-together hardware.
Preparation for Cabling the HP NetServer LXr8500
9

Advertisement

Table of Contents
loading

Table of Contents