HP D5970A - NetServer - LCII Reference Manual page 12

Rack assembly and cabling reference guide
Hide thumbs Also See for D5970A - NetServer - LCII:
Table of Contents

Advertisement

Chapter 1
3. Prepare Rack Enclosures for Assembly
WARNING
A tip-over hazard exists. Rack enclosures are shipped upright
and are top-heavy. Never move enclosures without adequate
equipment and assistance. Use caution to prevent rack from
falling over and causing potential damage or injury.
If you receive pre-configured units, follow assembly instructions from the
supplying organization first, if you have them. Otherwise, continue with this set of
instructions.
4. Move Rack Enclosures and Other Units to Installation Location
WARNING
Whenever you lift equipment, limit the amount of weight each
person picks up. Lift with your legs, not with your back.
Use two or more people and the proper equipment to move the rack enclosure,
server, mass storage units, and other components. Stage cartons a few feet from
your assembly and final power-up location.
5. Unpack Rack Enclosures and Hardware, Use Anti-Tip Measures, and Remove
the Shipping Panels
WARNING
Use care in moving the rack down from the pallet. Three
people are required for this step.
1. Follow any pictorial instructions on the outside of the shipping container to
unbox the rack enclosure.
2. Adjust the leveler feet, when present, under each of the four corners of
each rack. Lower each leveler foot to be in firm contact with the floor.
CAUTION
The leveler foot prevent the rack from rolling away when you
install components. Be sure to lower these feet before you put
anything into the rack.
3. Find and extend the anti-tip foot under the rack (or bolt on the anti-tip
mechanism, if included) before you mount any rack equipment on slides.
8
Preparation for Cabling the HP NetServer LXr8500

Advertisement

Table of Contents
loading

Table of Contents