Installing the Switch

Installation Procedures

Figure 2-1. Air flow direction of the 2910al switch
Installation Procedures

Summary

1.
2.
3.
4.
5.
6.
7.
2-4
Prepare the installation site
ment is properly prepared, including having the correct network cabling
ready to connect to the switch and having an appropriate location for the
switch. See
page 2-3
for some installation precautions.
Verify the switch passes self test
power source and observe that the LEDs on the switch's front panel
indicate correct switch operation. When self test is complete, unplug the
switch.
(Optional) Install a module
(page
Mount the switch
telco rack, in an equipment cabinet, or on a horizontal surface.
(Optional) Install a transceiver
module, you can now install one or two transceivers.
(Optional) Install mini-GBICs and SFPs
four slots for installing mini-GBICs. Depending on where you will mount
the switch, it may be easier to install the mini-GBICs first. Mini-GBICs can
be installed or removed while the switch is powered on.
Connect power to the switch
plug it into the nearby main power source.
(page
2-5). Ensure the physical environ-
(page
2-5). Plug the switch into a
(page
2-8).
2-11). The Switch can be mounted in a 19-inch
(page
2-14). If you have installed a
(page
(page
2-18). Once the switch is mounted,
2-16). The switch has

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Procurve 2910al

Table of Contents