5. Install the new battery.
Figure G-2: Installing the new battery
6. Install the server blade in the enclosure. See the "Installing a Server Blade"
section in Chapter 3.
7. Power up the server blade. See the "Powering Up the ProLiant BL e-Class
System" section in Chapter 3.
8. Run RBSU to reconfigure the server blade with the new battery. See the
"ROM-Based Setup Utility" section in Chapter 4.
HP ProLiant BL e-Class System Setup and Installation Guide
System Battery
G-3