Finishing Installation; Installing A Serial A Port In The Rear I/O; Install The Cover; Installing The Power Cord And Strain Relief Strap - Intel SE7500WV2 - Server Chassis - SR2300 Product Manual

Subassembly product guide
Hide thumbs Also See for SE7500WV2 - Server Chassis - SR2300:
Table of Contents

Advertisement

Finishing Installation

Installing a Serial A port in the Rear I/O

Using a standard DH-10 to DB-9 COM cable, you may install a Serial A port in the opening
provided in the rear I/O (see Figure 3, C, on page 10). Connect the other end to the COM 1 serial
port header on the server board (see the documentation that shipped with your server board).

Install the Cover

1. Place the cover over the chassis.
2. Slide it forwards until it latches into place.

Installing the Power Cord and Strain Relief Strap

NOTE
If you are placing the server in a rack, wait to install the power cord until
after the server is in the rack.
1. Attach the strain relief strap to the chassis (A).
2. Plug the power cord into the power supply but not into the power source.
3. Insert the power cord into the plastic loop (B) of the strain relief.
4. Pull the plastic band (C) until it tightens around the power cord.
To release the plastic loop and free the cord, squeeze the release lever (D).
Figure 28. Installing the Power Cord and Strain Relief Strap
Assembling the System
A
A
B
D
C
OM14095
41

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sr2300

Table of Contents