In this dialog, select the schemes to use for battery operation and AC operation. To add
or modify the schemes, click Edit Schemes, which opens an overview of the existing
schemes like that shown in Figure 28.2, "Overview of Existing Schemes" (page 529).
Figure 28.2 Overview of Existing Schemes
In the scheme overview, select the scheme to modify then click Edit. To create a new
scheme, click Add. The dialog that opens is the same in both cases and is shown in
Figure 28.3, "Configuring a Scheme" (page 530).
Power Management
529
Need help?
Do you have a question about the LINUX ENTERPRISE SERVER 10 SP2 - INSTALLATION AND ADMINISTRATION and is the answer not in the manual?