CommScope WCS-4 48Vdc Installation Manual

CommScope WCS-4 48Vdc Installation Manual

Subracks and power supply unit for era
Table of Contents

Advertisement

CommScope ERA®
WCS and e-POI Subracks and Power Supply Unit
Installation Guide • M0201ABK_uc • June 2021

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the WCS-4 48Vdc and is the answer not in the manual?

Questions and answers

Summarization of Contents

Document Overview
ERA Hardware System Components
Identifies ERA hardware components supported by the installation guide.
Document Revision History
Details changes and updates in the current manual release.
Document Cautions and Notes
Explains various warning and caution icons used in the document.
Abbreviations Used in this Guide
Lists and defines abbreviations used throughout the installation guide.
CommScope Part Numbers
Lists CommScope part numbers for the ERA hardware components.
ERA System Overview
ERA System Components
Describes Central Area Node, WIN, TEN, and Access Points in the ERA system.
WCS-2 and WCS-4 Subrack Overview
WCS Subrack Hardware
Details WCS-4 and WCS-2 subracks, their configurations, and operating temperature.
WCS Subrack Connectors and LEDs
Describes back panel connectors, alarm connectors, and LEDs on WCS subracks.
WCS Subrack Slot and Card Assignments
Outlines rules for installing cards in subrack slots based on configuration.
WCS Subrack Cards
Details various cards like SUI, RFD, OPT, CAT, AUT, and CDD for WCS subracks.
WCS Subrack Fan Trays and Filter Modules
Covers maintenance of fan trays and filter modules in WCS subracks.
Power Supply Unit Subrack and Rectifier Modules
PSU Subrack and Rectifier Modules
Describes the PSU Subrack and its capacity for 12 Vdc and 57 Vdc rectifier modules.
Rectifier Module Details
Details 12 Vdc and 57 Vdc rectifier modules, including LEDs and power specifications.
AP Powering and Capacity
Explains AP power consumption, WCS subrack capacity, and CAT card support.
Optional e-POI Subracks
e-POI Subrack and Components
Overview of the e-POI Subrack, IFC, and e-POI Modules for RF signal interface.
Safely Working with ERA Hardware
Health and Safety Precautions
Essential safety measures for handling ERA hardware components.
Installation Safety and Compliance
General installation safety, ESD protection, and FCC/ISED compliance guidelines.
Install the Subracks and PSU in an Equipment Rack
Rack Mounting Procedures
Guidelines for rack-mounting WCS, -48Vdc WCS, and e-POI subracks with PSUs.
Cable Connections
Procedures for connecting rear-panel cables for WCS and PSU, including -48Vdc variants.
Install and Connect the Subrack Cards
Install a Subrack Card
Guides on installing various cards like SUI, RFD, OPT, CAT, AUT, and CDD into WCS subracks.
Connect the SUI Card
Instructions for connecting the WCS Subrack to a laptop or LAN via the SUI Card.
Connect the RFD Cards
Details connecting RF cables to RFD cards for BTS/eNodeB or e-POI.
Connect the OPT Cards and Fiber Links
Covers OPT card connections, fiber link budget, SFP+ modules, and optical loss calculations.
Connect the CAT Cards
Guides on connecting APs to CAT Cards installed in Classic CAN or TEN.
Connect the AUT Cards
Rules and procedures for connecting AUT Cards to APs for Ethernet devices.
Connect the CDD Cards
Guides on installing CDD Cards and connecting them to the BBU for CPRI signals.
Maintenance
WCS Subrack Filter Module Maintenance
Procedures for cleaning and maintaining WCS subrack filter modules.
e-POI Module Removal
Steps for removing e-POI modules while preventing false alarms.
Cat6A Specifications and Testing Requirements
Cat6A Cable Specifications and Testing
Details Cat6A cable parameters and testing against TIA/EIA standards.
Contacting CommScope
CMS Global Technical Support
Provides contact information for CommScope Mobility Solutions Technical Support.
Telephone Helplines
Lists helpline numbers for live support from CommScope.
Online Support
Instructions for initiating a technical support ticket via CommScope's website.
Documentation and Training
Hardware to Software Mapping Information
Links to documents detailing ERA hardware and minimum software requirements.
Technical Training
Information on accessing CommScope University training courses.
Accessing ERA Series User Documentation
Steps to access ERA user documentation via the CommScope DCCS Customer Portal.

Table of Contents

Save PDF