Installing The Cover; Connecting The Cables - IBM 419452u - Servers System X3250 M2 Xeon 3.0ghz Installation Manual

Installation guide
Hide thumbs Also See for 419452u - Servers System X3250 M2 Xeon 3.0ghz:
Table of Contents

Advertisement

4. Update the server configuration. See "Updating the server configuration" on

Installing the cover

To install the cover, place it into position and slide it forward.

Connecting the cables

The following illustrations show the locations of the input and output connectors on
the front and rear of the server.
Front
Rear
Systems-management
connector
You must turn off the server before you connect or disconnect cables.
See the documentation that comes with any external devices for additional cabling
instructions. It might be easier for you to route cables before you connect the
devices to the server.
Cable identifiers are printed on the cables that come with the server and devices.
Use these identifiers to connect the cables to the correct connectors.
page 26 for more information.
USB 1 connector
Power-cord connector
USB 3 connector
USB 4 connector
USB 2 connector
Chapter 2. Installing optional devices
Serial connector
Video connector
Ethernet 2 connector
Ethernet 1 connector
25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

System x3250 m241904194

Table of Contents