Uninstalling The Slide Rail; Verifying Installation - H3C MSR-20-21 ROUTER Installation Manual

Msr 20 series routers
Hide thumbs Also See for MSR-20-21 ROUTER:
Table of Contents

Advertisement

Uninstalling the Slide Rail

Figure 3-13 Loosen the screw
Figure 3-14 Draw out the slide rail

Verifying Installation

During router installation, you must verify installation each time you power on the router, making sure
that:
Whether there is enough space around the router for heat-dissipation, and whether the workbench
is stable enough.
Whether the power supply that the power cord connects to is compliant with that required by the
router.
Whether the PGND wire of the router is correctly connected.
Whether the router is correctly connected to other devices, such as the console terminal.
The check after installation is very important. The stability, grounding of the router and power supply will
directly affect the operation of the router.
3-11

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MSR-20-21 ROUTER and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Msr 20-20Msr 20-40

Table of Contents