NOTES NOTES 1. NOTES NOTES NOTES 1.2 Electrical Safety Test Electrical Safety Test Electrical Safety Test Electrical Safety Test Electrical Safety Test According to IEC 601-1 and VDE 0751, 1.1 Saftey Notes Saftey Notes Saftey Notes Saftey Notes Saftey Notes 0701, an electrical safety test has to be carried out after the installation and PLEASE READ BEFORE ASSEMBLEY:...
The description of “Installation of the Power Tower” only refers to PT210. When installing a PT160 or PT110, please refer to page 72. 6. PLACE OF INSTALLATION The PT must be erected in a dust-free, dry and cool room. The room temperature in winter must not fall below +5°C and not exceed +30°C in summer.
7. ELECTRICAL INSTALLATION The electrical connection can be made via a CEE socket or across the ceiling or floor, together with the rest of the installation. When connecting the power supply via a CEE socket with a CEE plug connector, this must be outside the PT and be 1m above floor level, easy to see and safely accessible.
9. INSTALLATION AND ASSEMBLY OF THE MODULES Place tank module (TM) in the planned position. Levelling possible by adjustable feet (8) (Please use wate level). Levelling at a later point will be more difficult due to the increased weight of the compIetely assembled PT.
Place the suction rnodule (SM) on top and as with the CM, secure with 4 screws. 10.ELECTRICAL INSTALLATION OF THE MODULES An exact survey of the functional block diagrams, circuit layouts and designations can be found on the fold-out page of page 72. 10.1 Connection of compressor aggregates For the electrical connection of the...
10.2 Connection of suction machine The electrical connection of the suction machine is made with a 5-core cable (18) which is led to the mains junction box inside the right front corner (19) and there is connected to the terminals S(L1, L2, L3, N, PE).
10.5 Electrical connection of the PT’s on site Should the PT not be connected with the factory-supplied cable with CEE plug, the cable can be disconnected at the terminal block. In this case the terminals L1, L2, L3, N, PE are free to receive the leads of the customer’s own cable.
12.COMPRESSED AIR CONNECTION OF COMPRESSOR The compressed air connection can be made either with a Tecalon hose (27) or with other suitable material. The compressed air line must be led around the left side of the tank and with the tank pivoted back into the module the line should be cut to a suitable length and then connected.
After the installation and assembly of the PT an electric safety test according to VDE 0701, 0751 has to be carried out. This includes: • Visual check: look for possibly damaged parts • Check protective conductor resistance • Check insulating resistance •...
Remove bridge linking terminals 1 and 3 and make function check by taking suction hose out of hose holder. By all means observe direction of rotations, since only approx. 40% of cooling air is supplied with wrong direction and the aggregates will overheat.
16.DIFFERENCES BETWEEN DIFFERENCES BETWEEN DIFFERENCES BETWEEN DIFFERENCES BETWEEN 16.2 PT210 and PT110 DIFFERENCES BETWEEN The PT110 consists of only one module which 16.1 16.1 PT210 and PT160 PT210 and PT160 16.1 16.1 16.1 PT210 and PT160 PT210 and PT160 PT210 and PT160 is supplied ready assembled.
..39 A5 distributor outlet ventilator control 2a Power Tower 160 ......39 B1 thermostat 3a Power Tower 110 without control D1 tank for the suction machine ....39 ventilator 3b Power Tower 110 with control M1 suction machine for the suction machine ....
Need help?
Do you have a question about the POWER TOWER 110 and is the answer not in the manual?
Questions and answers