ELNA 7200 Instruction Manual page 27

Hide thumbs Also See for 7200:
Table of Contents

Advertisement

r
u
e
t y
i
o
Continue to pull the thread down into the right
channel and around the tension dial from right to
left.
Pull up on the thread until it is inserted between the
tension discs and under the loop of the check
spring t. Check that the thread is coming out
over the notch y of the disc.
y
t
Pull thread up the left channel to the take-up lever.
Pass thread from right to left side down into eye of
take-up lever u.
u
i
Proceed down to the lower thread guide i and pull
thread left. Slide the thread right behind the needle
bar thread guide o.
Thread the needle from front to back manually or
use the built-in needle threader.
o
26

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents