Rack Installation Procedures; Kit Contents - Intel SC5100 - Server Chassis Rack Optimized Hot Swap Redundant Pwr Installation Manual

Rack kit
Hide thumbs Also See for SC5100 - Server Chassis Rack Optimized Hot Swap Redundant Pwr:
Table of Contents

Advertisement

Rack Installation Procedures

This manual describes the procedure to convert an Intel
the pedestal configuration to the rack configuration.
In the following procedures, chassis directions (top, bottom, left, right) refer to a chassis in rack
orientation when you are facing the front of the chassis. Observe the safety and ESD precautions at
the beginning of this manual.

Kit Contents

Two unpainted access covers (SC5100 and SC5200 Base use the access cover without a fan
access door; SC5200 HSRP uses the access cover with a fan access door)
One unpainted left side cover with rack mounting holes and one right side cover with rack
mounting holes
One unpainted bottom cover
Rack bezel assembly
Bag of mounting hardware
This manual
Rail kit
Rack handles
5 ¼ bay reorientation bracket
NOTE
Your chassis is designed to be compatible with the EIA-310-d rack standard.
Be sure to select a rack cabinet enclosure that is EIA-310-d compliant. For
additional compatibility and rack cabinet selection information, see
http://support.intel.com/support/motherboards/server/chassis/sc5100
or
http://support.intel.com/support/motherboards/server/chassis/sc5200
®
SC5100 or SC5200 server chassis from
9

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SC5100 - Server Chassis Rack Optimized Hot Swap Redundant Pwr and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Sc2100Sc5200

Table of Contents