Installing The Bezel - Intel SC5100 - Server Chassis Rack Optimized Hot Swap Redundant Pwr Installation Manual

Rack kit
Hide thumbs Also See for SC5100 - Server Chassis Rack Optimized Hot Swap Redundant Pwr:
Table of Contents

Advertisement

4. Position the bezel. Make sure all of the plastic tabs are aligned with their holes.
5. Slide it to the left until the tab locks in place.
A
OM13724
A.
Tab
Figure 15. Installing the Bezel
26
Intel SC5100 and SC5200 Rack Kit Installation Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sc2100Sc5200

Table of Contents