Install Front Cover
1. For each 5 ¼-inch peripheral, remove the corresponding plastic cover.
2. If you have a hot swap bay installed, remove that plastic cover.
3. Position the bezel by sliding the tabs on the top under the bezel.
4. Tighten the thumbscrews.
28
Figure 17. Installing the Front Cover
Intel SC5100 and SC5200 Rack Kit Installation Guide
OM13731
Need help?
Do you have a question about the SC5100 - Server Chassis Rack Optimized Hot Swap Redundant Pwr and is the answer not in the manual?
Questions and answers