Download Print this page

Storage Canopy C2020R Assembly Instructions Manual

Shipping container roof single truss round style 5' arch space

Advertisement

Quick Links

Shipping Container Roof
Single Truss Round Style
Model# C2020R 20'x20'x6'7''
(5' arch space)
Assembly Instructions
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the C2020R and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Storage Canopy C2020R

  • Page 1 Shipping Container Roof Single Truss Round Style Model# C2020R 20’x20’x6’7’’ (5’ arch space) Assembly Instructions...
  • Page 2 Equipment List Speed Wrench 22#.23#.24# Hammer (30lb) Rope (12#) Long Tape (50m) Hammer Drill*1 Lifter*2 Crane*1 Forklift*1 Protective equipment...
  • Page 3 YOU MUST READ THIS DOCUMENT BEFORE YOU BEGIN TO ASSEMBLE THE SHELTER. Thank you for purchasing our shelter. When properly assembled and maintained, this product will provide years of reliable service. These instructions include helpful hints and important information needed to safely assemble and properly maintain the shelter.
  • Page 4 ANCHORING THE CONTAINER Make sure you have: Welder.   Cement.  Four 3” x 3” x 6 feet ¼” Square steel angle As shown in the diagram 1, make a 3 ft deep hole right beside one of the front and opposite rear corners of the container, in which the 6ft square steel will be installed.
  • Page 5 Highly Recommended 1. All container canopy covers need to be removed during windstorm of 60 mph, leaving frame assembled. Customer responsibility. 2. All container canopy covers need to be removed before a snowstorm of 1-2 inches (for single truss Shipping container roofs) and 3-4 inches (for double truss Shipping container roofs), leaving the frame assembled.
  • Page 6 20’x20’x6’7’’ Parts List Part Qty/ Description Code Roof 3-Way Fitting 4-Way Fitting Middle Bent Joist Lower Bent Joist Base Plate Base Plate Top Purlin Purlin Support Tube Lower Tensioning Tube for Roof Cover, 2 sets (3+1) pcs/set Winch for tensioning of roof cover (four corners) Tube Clip with bolt M10x50 for support tube...
  • Page 7 Carriage Bolt M8x70 for purlin End Plug Belt for Winch on base plate Knitting Rope for roof cover (2 bundles) bundles Roof Cover Duct Tape Expansion Bolt...
  • Page 8 INSTALLATION PROCESS Note: Make sure to fix the container firmly before installing the shelter. 1. Weld base plates (No.5 & No.6) to the top of container. Please refer to the diagram (Figure 1) to mark the position of base plates. Figure 1...
  • Page 9 2. Connect the 3-way fitting (No.1) and bent joist (No.3, 4) by bolt M8x60 (No.13) to be one arch, Arch No.1 & No.5. 3. Connect the 4-way fitting (No.2) and bent joist (No.3, 4) by bolt M8x60 (No.13) to be one arch, Arch No.2 to No.4.
  • Page 10 Arch No.2 to No.4 Installation Purlin and Support Tube Installation...
  • Page 11 Cover Installation 1. Put the cover EVENLY, CAREFULLY AND SLOWLY on the frame. Insert the tensioning tube (No.10) into the cover pipe pockets and loosely secure the belt (No.16) in the winch on based plate. DO NOT TIGHTEN. Adjust the cover so that it is square and evenly centered on the frame. Note: The end flaps must overhang evenly at both ends.