Page 1
1.2 Product description The SCIL-C is a gel sealed fiber optic splice closures designed for cable joint applications in the telecom outside plant network. The closures have maximum splicing capacity of 288F (6pcs trays and one tray with 2pcs changeable splice protectors holders and one holder capacity is 24F) and are suitable for deployment in aerial, underground or direct buried environments.
Page 2
2.2 Kit content 3.3 It is necessary to take precautions and keep the working space clean to protect the closure sealing materials and splices. Cable preparation 4.1 Open the closure, as shown: 4.2 Open the Velcro and tray kit. *Below listed is a standard kit, alternative kits and accessories are available.
Page 3
5.3 Tight the strengthen member by screw and keep the 5.7 Mark the position where rings will be installed. strengthen member out of the fix pole at 3~5mm. Tight the hose clamp with cable and cable bracket. 5.4 Select the ring with the hole’s size a little bigger than 5.8 Install the cut rings on the cable.
Page 4
5.10 Diameter of wraped gel strip should be one circle 5.13 Tight white tie wrap with cable bracket and remove higher than ring. Cut the gel tape at the direction of the spare length. the bending of cable bracket which can ensure the sealing by keeping the gel strip opening under the cable.
Page 5
6.2 Slide the transportation tubes over the fibers with overlap 100mm. Fiber splice and storage 7.1 Position the SCIL-C close to the splicing machine in a convenient location and secure the closure. 7.2 Slide the heat-shrinkable splice protection over one fiber and fuse fibers according to local recommendations and procedures.
Page 6
7.4 Install the tray lid. 7.7 Close the closure cover and make sure it is in right direction: AIR VALVE PORT CLOSED TO THE TRAY HINGE SIDE. 7.5 Lock the trays by clips. 7.8 Close the closure by latches in the proper sequence shown in picture.
Page 7
Wall mount kit installation 8.1 Install two wall mount bracket on the rear side of 8.2 Install closure on the wall by extension bolt kit. closure. Base Re-open Open all latched in the reversed order as described in 7.4.
Need help?
Do you have a question about the SCIL-C and is the answer not in the manual?
Questions and answers