Download Print this page

CanyCom SC75PD Operator's Manual page 27

Off-road rubber track dumper

Advertisement

4
3570M-0402-070E
3570M-0402-030E
Operation
9.
10. Push the choke knob to the original position.
11. Allow the engine to warm up by running
NOTE
• Drive the machine gently in the first week or
Starting in Cold Weather
3.
Clutch Lever
4.  F o l l o w 4 t o 1 0 i n t h e n o r m a l s t a r t i n g
5.  Move the clutch lever to [
6.
Clutch Lever
-18-
Move the throttle lever to [
it for 3-5 minutes without any load. (It is
not necessary when the engine is already
warm.)
so, (40-50 hours) of use after purchase for
breaking-in.
Move the clutch lever to [
position.
procedure above.
position.
Allow the engine to warm up by running it for
3-5 minutes without any load.
(slow)] position.
(disengaged)]
(engaged)]

Advertisement

loading
Need help?

Need help?

Do you have a question about the SC75PD and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Sc75Sc75pdev