Connect the Switch
■
The steps to connect the switch are as follows:
•
Ground the switch properly.
•
Connect the terminal block to the DC power supply (keep the power off).
•
Insert the terminal block into the switch.
•
Connect the switch to the internet.
Note:
1. The PoE ports shall not be used to charge lithium batteries or devices powered by lithium
batteries.
2. The PoE budget is based on lab tests and may vary due to power supply, client limitations,
and environmental factors.
3. The Fault Relay is a normally closed contact that will open the circuit when a Fault event is
triggered.
Caution:
1. To ensure IP40 protection, tighten the ground screw and all the mounting screws on the
switch regardless of installation method.
2. Keep the power off until everything is properly connected.
3. To avoid any device damage and bodily injury, connect the grounding stud to the
grounding surface properly before connecting devices.
4. Maintain an ambient temperature range of -40˚C~75˚C.
2.4 Verify Installation
After completing the installation, verify the following items:
•
There should be 5 to 10 cm of clearance around the device for ventilation and make sure
the air flow is adequate.
•
The voltage of the power supply meets the requirement of the input voltage of the device.
•
The device is well grounded.
•
The device is correctly connected to other network devices.
2.5 Power On the Switch
After the switch is powered on with the appropriate power supply, the corresponding Power
LED indicator(s) will light on all the time and the switch will begin the Power-On Self-Test. A
series of tests run automatically to ensure the device functions properly. After a few seconds,
Omada Industrial Easy Managed Switch
10
Need help?
Do you have a question about the Omada IES210GPP and is the answer not in the manual?
Questions and answers