3 P
-
RE
INSTALLATION
For each question, circle Y if the condition applies to your laboratory or N if it does not. When this
Pre-installation Checklist has been completed, see
and date the form, then send it along with all completed checklists to Micromeritics.
U
NPACKING AND
Unpacking and Inspection
Have the shipping cartons been unpacked and their contents
inspected?
Was there any shipping damage?
If Yes, has a claim been filed with the freight carrier?
n
Were all items on the packing list received?
If No, has Micromeritics been notified?
n
I
S
NSTRUMENT
PACE
Analyzer Space
Can the lab area where the analyzer will be placed accommodate
the combined dimensions of the analyzer, accessories, and
printer?
MIC SAS II 5800 Pre-installation Instructions and Checklist
580-42870-01 (Rev A) — Nov 2024
C
HECKLISTS
I
C
NSPECTION
HECKLIST
C
HECKLIST
3 Pre-installation Checklists
Dates and Signatures on page 4 -
Y
Y
Y
Y
Y
Y
1. Sign
Initial / Date
N
N
N
N
N
Initial / Date
N
3 - 1
Need help?
Do you have a question about the MIC SAS II 5800 and is the answer not in the manual?