Download Print this page

Dates And Signatures; Projected Installation Date; Commitment Statement And Signature Form - Micromeritics MIC SAS II 5800 Installation Instructions And Checklist

Sub-sieve autosizer
Hide thumbs Also See for MIC SAS II 5800:

Advertisement

4 D
ATES AND
All checklists and this completed form should be returned only if Micromeritics will be
performing this installation.
P
I
ROJECTED
NSTALLATION
This is not a commitment for a specific installation date. After reading the site preparation
requirements in this document, enter a date your site will be prepared and a preferred date for
installation. After returning the checklist and signed form to Micromeritics, your Micromeritics
representative will contact you to confirm an installation date.
When would installation be most convenient? Date: __________/________/________
C
S
OMMITMENT
TATEMENT AND
I have read this document and understand my responsibilities regarding preparations for the
installation of our analysis system. I believe this site is ready for the system to be installed.
Signature:
Name (Printed):
Title (Printed):
Company:
City / State / Zip:
Phone Number:
E-mail:
Analyzer:
Is the Customer Representative also the End User?
R
ETURN THE COMPLETED CHECKLIST AND FORMS TO
Micromeritics Instrument Corporation
ATTN: Service
4356 Communications Drive
Norcross, GA / USA / 30093-2901
MIC SAS II 5800 Pre-installation Instructions and Checklist
580-42870-01 (Rev A) — Nov 2024
S
IGNATURES
D
ATE
S
Model:
Email: Service.Helpdesk@Micromeritics.com
F
IGNATURE
ORM
Fax Number:
Serial No.:
Yes ______ No ______
:

4 Dates and Signatures

Date:
4 - 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the MIC SAS II 5800 and is the answer not in the manual?

Subscribe to Our Youtube Channel