PERCo ST-01 Assembly And Operation Manual

Speed gate and double-sided section
Hide thumbs Also See for ST-01:

Advertisement

Quick Links

ASSEMBLY AND OPERATION MANUAL
ST-01, STD-01
SPEED GATE AND DOUBLE-SIDED SECTION

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ST-01 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for PERCo ST-01

  • Page 1 ASSEMBLY AND OPERATION MANUAL ST-01, STD-01 SPEED GATE AND DOUBLE-SIDED SECTION...
  • Page 2: Table Of Contents

    ST-01 Speed gate, STD-01 Double-sided section CONTENTS APPLICATION ........................2 OPERATING CONDITIONS ....................3 TECHNICAL SPECIFICATIONS .................... 3 DELIVERY SET ........................4 Standard delivery set ....................... 4 4.1.1 ST-01 Speed gate ........................4 4.1.2 STD-01 Double-sided section ....................5 Additional equipment to be supplied upon request ............6 DESIGN AND OPERATION ....................
  • Page 3: Application

    1 APPLICATION The ST-01 Speed gate (hereinafter referred to as the speed gate) is a blocking device with swing panels designed for control of pedestrian flows at checkpoints of administrative buildings, at banks, shops, railway stations, airports, etc.
  • Page 4: Operating Conditions

    The power supply unit is connected only to the control board located in the Master section (on the Master side of the double-sided section) and marked as ST-01.771. Consumption current and power consumption are specified for each product, ST-01 and STD-01, individually.
  • Page 5: Delivery Set

    The type of section top covers is to be chosen by the Customer when placing an order. The following top cover models are available for the ST-01 speed gate section: • STC-01G – is made of tempered glass and features a built-in indication block;...
  • Page 6: Std-01 Double-Sided Section

    ST-01 Speed gate, STD-01 Double-sided section Packaging: Transportation box #1 for the Master section ................1 Transportation box #2 for the Slave section ................1 Transportation box for section top covers ................. 1 Transportation box for swing panels ..................1 4.1.2 STD-01 Double-sided section...
  • Page 7: Additional Equipment To Be Supplied Upon Request

    Figure 1. Overall dimensions of the speed gate with ATG-300 swing panels The WRC kit consists of a receiver, connected to the control board, and transmitters designed as fobs. A total of 22 anchors are required for installation of ST-01, and 14 anchors for PERCo-STD-01.
  • Page 8 ST-01 Speed gate, STD-01 Double-sided section Figure 2. Overall dimensions of the speed gate with ATG-300H swing panels Figure 3. Overall dimensions of the speed gate with ATG-425 swing panels...
  • Page 9 Assembly and Operation Manual Figure 4. Overall dimensions of the speed gate with ATG-425H swing panels Figure 5. Overall dimensions of the speed gate with ATG-475 swing panels...
  • Page 10 ST-01 Speed gate, STD-01 Double-sided section Figure 6. Overall dimensions of the speed gate with ATG-575 swing panels Figure 7. Overall dimensions of the speed gate when arranging several passage zones...
  • Page 11: Design And Operation

    Assembly and Operation Manual 5 DESIGN AND OPERATION 5.1 Main features The speed gate allows its users to pass through it one by one in one direction without the • swing panels being closed between their passages. The speed gate is a normally-open device, which means that when the equipment is de- •...
  • Page 12 ST-01 Speed gate, STD-01 Double-sided section Figure 8. Overall view and design of ST-01: 1 – swing panel; 2 – central post; 3 – central post indication block; 4 – swing panel cover plate; 5 – central post cover plate; 6 – rear panel of the central post;...
  • Page 13 20 – CAN cable to the Master section (side); 21 – DC cable from the Slave section (side) 22 – CAN cable from the Slave section (side) Not included in the standard delivery set. From the delivery set of ST-01 or adjacent STD-01.
  • Page 14: Indication Blocks

    (“a hand with a card” pictogram). The bottom part of the central post of the Master section (side) features the ST-01.771 speed gate control board (hereinafter, the control board). The PS unit, RC panel (WRC receiver), Fire Alarm device, and Slave section connection cables are connected to the control board.
  • Page 15: Rc Panel

    Assembly and Operation Manual The front block indication type can be chosen during the installation of the speed gate by connecting the front indication block cable to the corresponding indication control module connector (located under the speed gate’s section top cover on the protection plate, Fig. 22). By default, the cable is connected to the ARROW connector, which enables the display of the white arrow.
  • Page 16 ST-01 Speed gate, STD-01 Double-sided section The control board features a microcontroller, which processes the incoming control commands, transmitted to the Unlock A, Stop, Unlock B, and Fire Alarm control inputs, monitors the status of optical sensors of swing panel rotation, and generates commands for the motor drive of the speed gate’s swing panels on the basis of the data received.
  • Page 17: Control Signal Parameters

    Assembly and Operation Manual • XP4 (Update) – connector for switching the control board to the built-in software update mode through the USB interface. The jumper is removed by default. • XP6 (BUZZ) – connector for turning on the buzzer on the control board. Buzzer operation duplicates the sound indication of the RC panel and siren activation.
  • Page 18: Control Modes

    ST-01 Speed gate, STD-01 Double-sided section Fire Alarm input. The control signal is removal of a low-level signal from the Fire Alarm contact in relation to the GND contact. A normally closed relay contact or an open collector output circuit can serve as a control element.
  • Page 19: Speed Gate Operation Algorithm

    (opening or closing) is blocked. In the normal control mode (MODE2 jumper is installed), the entire passage zone of the ST-01 turnstile is covered; in the enhanced control mode (MODE2 jumper is removed, by default), the “safe” zone is limited by the...
  • Page 20: Speed Gate Control Devices

    ST-01 Speed gate, STD-01 Double-sided section 5. After the user passes through the open swing panels and gets into a safe zone (zone, in which it is impossible to come into contact with the swing panels), the control board microcontroller sends a command for the motor drive to close the swing panels.
  • Page 21: Fire Alarm Device

    Assembly and Operation Manual The standard RC-panel orientation in respect of sections is shown in Fig. 14. If the operator’s workplace is located on the opposite side relative to the Master section, it will be more convenient to reverse the RC-panel wires that are connected to the Unlock A and Unlock B contacts, as well as to Led A and Led B respectively (Table 4).
  • Page 22: Pass Outputs

    ST-01 Speed gate, STD-01 Double-sided section 5.4.1 PASS outputs The connection to the PASS A and PASS B relay outputs is performed through the Pass A, Pass B, and Common contacts of the X3 terminal block on the control board in accordance with the speed gate connection layout (Fig.
  • Page 23: Marking And Packaging

    Box with ATG-575 (set of swing panels) ..............66×71×8 cm Weight of the transportation boxes (gross): ST-01: Box #1 (ST-01/M section) ................max. 130 kg Box #2 (ST-01/S section) ................max. 125 kg STD-01: Box #1 (double-sided section) ................ max. 145 kg Box with STC-01 (set of section top covers) ............
  • Page 24: Safety Requirements

    ST-01 Speed gate, STD-01 Double-sided section 7 SAFETY REQUIREMENTS Installation safety The speed gate shall be installed by the persons that have fully studied this Manual and have been instructed in safety, in compliance with general rules of electrical and installation works.
  • Page 25: Tools And Equipment Required For Installation

    Master section panel (side of the double-sided section) should always be placed opposite to the Slave section panel (side of the double-sided section). You can find a video tutorial on the assembly and installation of the ST-01 product on the website www.perco.ru in the Video section.
  • Page 26 Slave side (if they have not been laid within the cable duct earlier). Lead them Use the cardboard template (included in the ST-01 kit) to mark holes; it is also used to mark holes for the STD-01 double-sided sections.
  • Page 27 (installer) with due consideration for the checkpoint design and the characteristics of the access control system and management controller. It is possible to outfit the ST-01 speed gate section with readers manufactured by PERCo (IR13, IR19) or third-party manufacturers.
  • Page 28 ST-01 Speed gate, STD-01 Double-sided section connector of the indication control module will activate the display of the white arrow on the front indication block. The cable connected to the CROSS connector will activate the display of the red cross (Sect. 5.2.2, 8.9.2, Fig. 22).
  • Page 29: Marking Layouts For The Mounting Surface

    Assembly and Operation Manual 8.5 Marking layouts for the mounting surface Figure 17. Marking layout for the speed gate installation The diameter of the holes in the layout is indicated for anchors of the PFG IR10 SORMAT type; when using other types of anchors, it is necessary to make holes of corresponding sizes.
  • Page 30 ST-01 Speed gate, STD-01 Double-sided section Figure 18. Marking layout for installation of the speed gate and double-sided section The diameter of the holes in the layout is indicated for anchors of the PFG IR10 SORMAT type; when using other types of anchors, it is necessary to make holes of corresponding sizes.
  • Page 31: Electrical Connection Layout Of The Speed Gate

    Assembly and Operation Manual 8.6 Electrical connection layout of the speed gate Figure 19. Connection layout of the ST-01 Speed gate and STD-01 Double-sided sections for arrangement of a checkpoint with several passage zones Table 6. List of the elements of the speed gate’s electrical connection layout...
  • Page 32 ST-01 Speed gate, STD-01 Double-sided section Figure 20. Electrical connection layout of the speed gate The list of elements is given in table 6. Equipment marked with an asterisk (*) is not included in the standard delivery set. When operating the turnstile as part of an ACS, it is recommended to connect the remote control (A3) to...
  • Page 33: Training Mode

    Assembly and Operation Manual Attention! It is recommended to make the FA input galvanically independent from the fire alarm and from other turnstiles. 8.7 Training mode The mode allows the initial (closed) position of the speed gate’s swing panels to be regulated manually.
  • Page 34: Assembly And Disassembly Of Speed Gate Components

    ST-01 Speed gate, STD-01 Double-sided section 3. When the passage is performed in the direction opposite to that selected for the Automatic opening in the selected direction mode, the operation algorithm is similar to the ordinary algorithm (Sect. 5.2.7). During the authorized passage, the Automatic opening in the selected direction mode is switched off for the passage duration (passage waiting period).
  • Page 35: Front Panel Of The Side Post

    Assembly and Operation Manual When installing the cover plate on the central post, press down on the cover plate, carefully insert all its hooks into the slots on the post housing, and release it. The cover plate should click into place driven by a spring-loaded foot located at the bottom on the inside of the cover plate.
  • Page 36: Swing Panel Cover Plate

    ST-01 Speed gate, STD-01 Double-sided section 8.9.4 Swing panel cover plate The swing panel cover plate (4) consists of two parts. In order to install the cover plate, proceed as follows: 1. Turn the rotary support of the swing panel in a clockwise direction as far as it goes.
  • Page 37: Section Top Cover

    Assembly and Operation Manual 2. Pull the cable under the jumper in the duct and connect it to the LED connector. 3. Install the indication block on the surface located above the rotary support of the swing panel and, using an SW4 Allen key, fix it on the post top duct (12), using two M5×16 screws with washers from the delivery set.
  • Page 38 ST-01 Speed gate, STD-01 Double-sided section Figure 25. Installation of the STC-01G (SDC-01G) section top cover Installation procedure for the STC-01GS (SDC-01GS) section top cover (see Fig. 26): • Take one glass part of the top cover featuring an indication block and connect the connection cable of the indication control module (PASS connector, Fig.
  • Page 39: Bottom Duct Cover

    (see Fig. 27). Moreover, the customer can avail themselves of the services of special companies dealing with professional glass polishing or purchase new covers for replacement from PERCo. Figure 27. Gluing a rubber pad on the glass cover 8.9.7 Bottom duct cover...
  • Page 40: Filling Glass

    5. Remove both covers from the bottom duct (14) (Sect. 8.9.7). 6. For the ST-01 section: remove the central post’s rear panel (6). Unscrew 2 M6×16 screws (for an SW5 Allen key) in the bottom ducts, one M6×16 screw (for an SW5 Allen key) at the bottom of the central post, and 2 M5×12 screws (for an SW4 Allen key) in the top duct (Fig.
  • Page 41 Assembly and Operation Manual Figure 29. Filling glass fixing in the ST-01 central post Figure 30. Filling glass fixing in the central post of the STD-01 double-sided section Figure 31. Removal of the central post’s rear panel...
  • Page 42: Operation

    ST-01 Speed gate, STD-01 Double-sided section 9 OPERATION When operating the speed gate, comply with safety measures in accordance with Sect. 7.2. Attention! Do not move any objects with dimensions exceeding the passageway width through the • passage zone. Do not jerk and hit any elements of the speed gate to prevent their mechanical •...
  • Page 43: Potential Control Mode

    Assembly and Operation Manual Table 7. Pulse control mode Indication RC-panel operator Command Speed gate state actions RC panel Central post Press the STOP Red Stop indicator is Red for both The swing panels Passage button directions are closed denial The swing panels Red Stop indicator is open in the passage...
  • Page 44: Fire Alarm Mode

    Troubleshooting Possible faults to be corrected by the customers themselves are listed in Table 9. If the fault cannot be eliminated, we advise you to contact the PERCo Technical Support Department. Table 9. Troubleshooting Most probable...
  • Page 45: Transportation And Storage

    Assembly and Operation Manual 11 TRANSPORTATION AND STORAGE The speed gate may be stored in dry indoor facilities at an ambient air temperature from -40°C to +50°C and relative air humidity of up to 80% at +15°C. The storage premises must be free of acid and alkaline vapors as well as corrosive gases.
  • Page 46: Appendix 1. Command Transmission Algorithm In Pulse Control Mode

    ST-01 Speed gate, STD-01 Double-sided section Appendix 1. Command transmission algorithm in pulse control mode Passage denial (locked for entry and exit) – active front at the Stop contact while there is a high level at the Unlock A and Unlock B contacts. Both passage directions are blocked at this command.
  • Page 47: Appendix 2. Command Transmission Algorithm In Potential Control Mode

    Assembly and Operation Manual Appendix 2. Command transmission algorithm in potential control mode Both directions closed (locked for entry and exit). There is a high level at the Unlock A and Unlock B contacts or a low level at the Stop contact. Both passage directions are blocked at this command.
  • Page 49 PERCo Polytechnicheskaya str., 4, block 2 194021, Saint Petersburg Russia Tel: +7 812 247 04 64 E-mail: export@perco.com support@perco.com www.perco.com...
  • Page 50 www.perco.com...

This manual is also suitable for:

Std-01

Table of Contents