BendPak 16AP Installation And Operation Manual

Clear floor two-post lifts

Advertisement

Quick Links

Installation and Operation Manual
Models:
• 16AP
• 16AP-192
• 20AP
• 20AP-192
Original instructions in
the English language
Designed and engineered by BendPak Inc. in Southern California, USA. Made in China.
IMPORTANT Safety Instructions, save these instructions! Read the entire contents of
this manual before using this product. Failure to follow the instructions and safety precautions in this
manual can result in severe injury or death. Make sure all other operators also read this manual. Keep
the manual near the product for future reference. By proceeding with setup and operation,
you agree that you fully understand the contents of this manual and assume full
responsibility for product use.
Clear Floor Two-Post Lifts
Manual P/N 5900377 — Manual Revision A1 — June 2024
20AP model shown above.
DANGER
30440 Agoura Road.
Agoura Hills, CA 91301 USA
Toll Free: (800) 253-2363
Telephone: (805) 933-9970
bendpak.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 16AP and is the answer not in the manual?

Questions and answers

Summary of Contents for BendPak 16AP

  • Page 1 English language 20AP model shown above. ⚠ Designed and engineered by BendPak Inc. in Southern California, USA. Made in China. DANGER IMPORTANT Safety Instructions, save these instructions! Read the entire contents of this manual before using this product. Failure to follow the instructions and safety precautions in this manual can result in severe injury or death.
  • Page 2 Copyright . Copyright ©2024 by BendPak Inc. All rights reserved. You may make copies of this document if you agree that: full attribution goes to BendPak Inc., you are not authorized to make changes to the content, you do not gain any rights to this content, and you will not use the copies for commercial purposes.
  • Page 3 Number, and the Date of Manufacture from the ID label on your unit. This information is required for part or warranty issues. Model: Serial: Date of Manufacture: 20AP-192 model shown above. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 4: Table Of Contents

    Introduction This manual describes four BendPak Two-Post Lift models: • 16AP. A Two-Post Lift with an overall height of 169 in. (4,294 mm) that raises Vehicles up to 16,000 pounds (7,258 kg). • 16AP-192. A Two-Post Lift with overall height of 193 in. (4,904 mm) that raises Vehicles up to 16,000 pounds (7,258 kg).
  • Page 5: Shipping Information

    3. Make sure all operators read and understand this Installation and Operation Manual. Keep the manual near the Lift at all times. 4. BendPak recommends referring to the ANSI/ALI ALIS Standard Safety Requirements for Installation and Service for more information about safely installing, using, and servicing your Lift.
  • Page 6 Additional Safety Information The following safety information applies to all BendPak 16AP and 20AP Series Two-Post Lift models: 18. 16AP and 20AP Series Lifts are Two-Post Service Lifts. Use them only for their intended purpose. 19. You must wear OSHA-approved (publication 3151) personal protective equipment at all times when installing, using, maintaining, or repairing the Lift.
  • Page 7 BendPak at (805) 933-9970 select option 7, then 4 or email support@bendpak.com. 27. BendPak recommends making a thorough inspection of the Lift at least once a year. Replace any damaged or severely worn parts, decals, or warning labels.
  • Page 8: Components

    Components Not all components shown. Models with extensions are taller. Reference only – do not scale. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 9: Specifications

    Specifications Top View Approach View Reference only – do not scale. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 10 Top Safety Lock. Lift Arm length measured from the Lift Arm pivot point to the Lift Cradle Pad’s center pin. Special Voltages available. Specifications subject to change without notice. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 11 Top Safety Lock. Lift Arms measured from the Lift Arm pivot point to the Lift Cradle Pad’s center pin. Special Voltages available. Specifications subject to change without notice. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 12: Installation Checklist

    Installation Checklist Following are the steps needed to install the 16AP or 20AP Series Two-Post Lifts; perform them in this order. ☐ 1. Review the Safety Rules. ☐ 2. Make sure you have the necessary tools. ☐ 3. Plan for Electrical Work.
  • Page 13: Installation

    Reviewing the Safety Rules When installing a Lift, your safety depends on proper training and thoughtful operation. BendPak recommends referring to the ANSI/ALI ALIS Standard Safety Requirements for Installation and Service for more information about safely installing, using, and servicing your Lift.
  • Page 14 Local electrical codes may vary, and other requirements may exist that the installing electrician will address, if required. Refer to Installing a Thermal Disconnect Switch for more information. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 15 Power Unit Opposite the Approach ⚠ CAUTION When installing the Overhead Assembly, always orient the assembly to place the overhead limit switch on the Power Unit side of the Lift. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 16 Figures are not to scale. Additional distance may be required in the front and rear of the Lift to allow vehicles to be safely driven in or out from these directions. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 17 • Power. You need an appropriate VAC power source for the Lift’s Power Unit. • Outdoor installations. 16AP and 20AP Series Two-Post Lifts are approved for indoor installation and use only. Outdoor installation is prohibited. • Floor. Only install the Lift on a flat, concrete floor; do not install on asphalt or any other surface.
  • Page 18 Posts are standing. This position will also allow the initial placement of the equalizing cables. 16AP and 20AP Series Lifts have two Safety Assemblies: one on the power side post and the other on the off side post at the same height.
  • Page 19 2. Slide the lift heads away from the bottom of both posts. Move them far enough to clear the safety lock and provide room to work. Figure above not to scale. Components removed for clarity. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 20 6 below. 6. On the back side of the Power Post connect the pivot pin, the safety pivot holder and the safety release handle using the fasteners depicted below. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 21 Reference only – do not scale. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 22 Move the Equalizing Cables into Position BendPak recommends placing the equalizing cables into position before standing the posts up. Loop the excess cable at the top of the post secured with a zip tie or tape. NOTICE The two equalizing cables are the same length.
  • Page 23 Figure above details the cable sheave near the bottom of the post. Reference only – do not scale. NOTICE Keep the post sheave, sheave pin, and bolt nearby where they will not be lost or damaged. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 24 9. Push the threaded end of the equalizing cable through the lift head and out the hole at the top of the lift head. Refer to the figures below. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 25 11. Move both lift heads back down to the bottom of each post. 12. Coil up and bind the remainder of the cable at the top of the lift post temporarily. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 26 Post Extensions 16AP-192 and 20AP-192 only Model numbers 16AP-192 and 20AP-192 are supplied with post extensions that increase the height of the posts and allow the Lift to raise taller vehicles. The post extensions are slipped over the top of both lift posts and then bolted into place.
  • Page 27 Hydraulic Hoses and Fittings on the Lift, making your new Lift inoperable and unusable. Your Lift is shipped with clean components; however, BendPak strongly recommends that you take secondary precautions and clean all Hydraulic Hoses and Fittings prior to making connections. It is better and less costly to take these extra steps now so that you do not need to take your Lift out of service later to fix issues that could have been prevented at the time of installation.
  • Page 28 3. Tighten the Fitting into the connector; do not over tighten the Fitting. 4. Allow the 24-hour manufacturer-recommended curing time before pressurizing the system. Identifying Hydraulic Fittings Joint Industry Council (JIC) National Pipe Thread (NPT) 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 29 Preposition some hydraulic components before standing up the posts. This section will focus on making the connections on each post and coiling the hoses at the top of the post. All 16AP and 20AP Series Lifts use three Hydraulic Hoses (shown in the illustration below): Hose A varies based on the length required.
  • Page 30 JIC end of the elbow hydraulic fitting; tighten securely. 8. Switching to the Off Side Post, connect the other elbow fitting (5550113) to the hydraulic port at the bottom of the hydraulic cylinder. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 31 . The Power side post should have the B and C hoses connected to the bulkhead tee. Refer to the figure below. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 32 Overall Width for the Lift model being installed. 4. When moving the lift posts in the next section, place the base plates into the corners created by the Chalk Line Guides as shown above. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 33 BendPak Lifts are supplied with installation instructions and concrete fasteners meeting the criteria as prescribed by the latest version of the American National Standard “Automotive Lifts – Safety Requirements for Construction, Testing, and Validation.”...
  • Page 34 Lift Post as it is raised. You must use the appropriate safety gear including safety glasses, dust masks, gloves, steel-toed work boots and heavy work clothes when anchoring the Posts. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 35 Do not drill all the way through the Concrete; if you punch completely through the slab, you could compromise the holding strength of the Anchor Bolts. 4. Vacuum each hole clean. BendPak recommends using a vacuum to get the hole very clean. A wire brush, hand pump, or compressed air may also be used.
  • Page 36 7. Plumb each Post; install Shims as required. See Troubleshooting Lift Arm Lock if you are required to shim ≥ .5 in (13 mm). Disengagement 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 37 Do not use an impact wrench to torque the Anchor Bolts. CAUTION 9. Install the Foot Guard on the power side post as shown in the figure above and below. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 38 If two overhead limit switches are included with the Lift, a three-phase Power Unit is to be installed, install the two switches next to each other on the Limit Switch Bracket. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 39 5. Bolt the overhead assembly to the top of the posts using two bolts, lock washers and hex nuts on each end of the overhead. 6. Install the Romex Connector in the overhead assembly. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 40 IMPORTANT! Verify all electrical cables and hoses are secured in their clips inside both Lift Posts and routed to avoid moving components and pinch points. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 41 When the equalizing cables are correctly routed, they are mirror images of each other. Refer to the figure below. Not to scale. Components removed for clarity. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 42 6. Lubricate the both Sheave Pins and Bearings with red lithium grease, then re-install the Sheaves, Sheave Pins, and secure with the M6 x 10 hex head bolts. 7. At the other Post, repeat the procedure with the other Equalizing Cable. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 43 8. Install the threaded end of the Equalizing Cable through the hole at the top of the Lift Head, then install the flat washer, hex nut, and tighten. 9. Perform Steps 3 through 9 for the remaining Equalizing Cable. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 44 1. Retrieve the supplied four M8 Hex Head Bolts, M8 Lock Washers, and one Vibration Dampener. 2. Remove the Power Unit from the packaging material. Important The Power Unit is heavy. BendPak recommends having one person hold the Power Unit while a second person bolts it into place.
  • Page 45 You will need to access the Overhead Assembly to route the Safety Lock Cable. WARNING Use care to avoid falling when working on a ladder or other lifting device. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 46 Safety Sheaves; this keeps it out of the way of the Equalizing Cables and the Hydraulic Hoses. ⚠ DANGER Verify both the power side and the Offside Safety Assemblies engage/disengage properly before operating the Lift. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 47 Lift Posts. All cables and hoses must be tight and flat inside the Posts and routed to avoid moving components and pinch points. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 48 Hydraulic Pressure Port. Do not connect to any of the other Ports and do not connect to more than one Hydraulic Pressure Port. Refer to the figure below. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 49 2. Retrieve the M6 Set Screws from the Parts Bag. 3. Remove and retain the Compression Spring and the Arm Internal Gear Stop from the Lift Head. Refer to the figures below. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 50 5. Insert the Lift Arm into the Lift Head, then slide the Arm Lock Guide Rod through the openings in the Lift Head and Lift Arm Assembly (refer to the figure below). 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 51 7. Insert the Arm Lock Pin through the holes in the Lift Head and into the Lift Arm Assembly. 8. Retrieve an M6 x 12 Cone Point Set Screw and thread one set screw into the Arm Weldment Mount Tube securing the Arm Lock Pin. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 52 Each Lift Arm Assembly must be inspected and adjusted as required before each use. Do not operate the Lift if any of the four Lift Arm restraint systems are not functioning correctly. Replace any damaged components with approved replacement parts. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 53 M10 Hex Nuts (5535013) on each Lift Post. Torque the Hex Nuts to 2-3 ft. lb. Hydraulic Hoses are to be routed over the Double Threaded Rods. ⚠ The Double Threaded Rods must be installed to ensure proper operation of the Lift. WARNING 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 54 Locks (there is a distinct thump). The thumps to be simultaneous or close to it. If you have not yet torqued the Anchors you can torque them to specification (85 – NOTICE 95 ft lb.) once you have completed final leveling. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 55 – For a 208 to 230 VAC, circuit, protected by a 30 Amp time delay fuse or circuit breaker for the 5585685 power unit delivered with the Lift. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 56 The 16AP or 20AP Series Lift is provided with the following Power Unit: • 208 - 230 VAC, 50/60 Hz, 1 Phase, 5 HP at 23 Amps. 110 VAC Power Units are currently not available for the 16AP or 20AP Series Lifts. NOTICE To install Three-Phase Power units see Three Phase Power Unit Wiring.
  • Page 57 Electrical Box or inside the cover of the Electrical Box. Have the Electrician use that wiring information to wire the Power Unit to the power source. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 58 Wire a power cord (with appropriate plug) to the wiring that was connected to the Pigtail. 3. Wire the overhead limit switch(es) into the incoming power. Refer to Wiring Diagrams for wiring information. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 59 Have the Electrician select a UL-listed Power Disconnect Switch. Running high electrical current that exceeds the motor’s full load amperage (FLA) rating may result in permanent damage to the motor. BendPak strongly recommends you not exceed the rated duty cycle of the Lift motor. 16AP and 20AP Series Two-Post Lifts...
  • Page 60 All Cable Sheaves and Cable Sheave Pins on both Posts. • The four inside corners of both Posts • All Safety Sheaves • All Lift Arm Pivot Points 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 61 Perform an Operational Test Before putting your Lift into normal operation, BendPak recommends raising and lowering it several times with a typical Vehicle on the Lift. This will help you get a feel for how to operate the controls and help get any residual air out of the Hydraulic System (sometimes called “bleeding”...
  • Page 62 Lift Arms from rising. Leave the Manual with the Owner/Operator Leave the Installation and Operation Manual with the owner/operator so that it is available to everyone who will use the Lift. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 63: Operation

    Operation This section describes how to operate your BendPak 16AP and 20AP Series Lift. ⚠ DANGER Automotive Lifts are dangerous tools when used by inexperienced or impaired technicians. When you even hear the words “automotive lift,” your brain should automatically register the fact that lifting a Vehicle is a serious endeavor with life- threatening risks if mandatory lifting precautions are ignored.
  • Page 64 Never place Contact Pads on non-approved, non-load holding Sill Covers or Side Skirts! Standard Accessories The 16AP and 20AP are supplied with: • Four Drop-In Frame Cradle Pads (5215761) Best suited for lifting trucks, vans or other frame Vehicles that require additional stability.
  • Page 65 Super Wide Frame version fits frames up to 6.5 in. (168 mm) (5210253) wide, set of 2. • Cradle Lift Pad — Wide Polyurethane Pad, set of 4 pads (5210231). 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 66 Steel Lift Pads — Recommended for additional stability on all vehicles. The flanged edges grip the chassis for an extra-secure hold. (5215692) You may contact BendPak for accessories and replacement Parts information at (800) 253-2363, press option 7, then 5; please have the model and serial number of your Lift available. Visit bendpak.com...
  • Page 67 Lift, or the manufacturer of the Vehicle. To order additional copies, contact ALI or BendPak Support email support@bendpak.com or call (800) 253-2363, press option 7, then 4. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 68 Two-Post Frame Engaging Lift. Contact the Vehicle’s manufacturer for Raising or Jacking guidance. The figure on the next page illustrates typical lifting points based on Vehicle Frame type. Typical Lifting Points 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 69 If any of the pads/adapters are not making solid contact with the lifting points, carefully lower the Lift and begin again; the pads/adapters must make solid contact with all lifting points. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 70 20. Begin work on the Vehicle. Always use safety stands when working under a vehicle. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 71 5. When the Lift is on the ground, release both Handles, then move all four Lift Arms to their full drive- through positions to allow an unobstructed exit for the Vehicle. 6. Carefully drive the Vehicle out. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 72 Lift raised but not engaged on Safety Locks, the Vehicle is not secure. It could fall, possibly damaging the Vehicle, the Lift, and injuring anyone under the Vehicle. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 73: Maintenance

    Unless stated otherwise, all maintenance may be performed by the owner/employer and does not require trained lift service personnel. Replace worn, damaged or broken parts with original BendPak or BendPak approved parts or with parts that meet or exceed the original specifications.
  • Page 74 Replace as required. 8. Verify all fasteners are torqued to specifications. 9. Verify all Warning labels are in good condition and legible. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 75 1. Relax Equalizing Cables, as outlined above. 2. Unscrew the Sheave Pin Bolt. 3. Remove Sheave Pin. 3. Apply Red Lithium Grease to Sheave Pin. 4. Reassemble and tighten all fasteners. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 76 16AP and 20AP Series Wire Rope Inspection and Maintenance The Lift’s wire ropes should be inspected regularly: • Lifting and equalizing cables should be replaced when there are visible signs of damage or extreme wear. Do not use the Lift if it has damaged or worn cables.
  • Page 77 Torque Chart 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 78: Troubleshooting

    Lubricate hinge points using white lithium grease. Technical support and service is available from your dealer, on the Web at bendpak.com/support, by email at support@bendpak.com, or by phone at (800) 253-2363, press option 7, then 4. Online chat is also available at www.bendpak.com...
  • Page 79 4. When the Lift heads are on the ground and the Lift is in a safe condition, remove power from the Lift and replace the Safety Cable. Reference only – do not scale. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 80 8. Adjust the safety cable as necessary to ensure both safety locks disengage simultaneously when pressing the POWER SIDE SAFETY HANDLE ASSEMBLY. Also, confirm that positive safety lock engagement occurs at both columns during lift operation. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 81 Washers, or a backing nut (not supplied) may be used to extend the contact point of the Arm Lock Pins. Adjust the Bolt head position to disengage the Lock as required. Refer to the figure below. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 82 If you are unable to find an appropriate facility, the website earth911.com has resources that may be of help. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 83: Wiring Diagrams

    If strands are bridging, correct before proceeding. 6. Replace the Switch Cover and secure with the three screws removed in step 1. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 84 National Electrical Code (NEC). The Thermal Disconnect while not an NEC requirement may be required by local electrical code. Power Unit (5585685) 208-230VAC, 1 Ph., 50/60 Hz. 5 HP, 23 Amps, CSA approved 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 85 Normally Closed Terminals on each switch. Refer to the figure below. Inspect to verify no stray or broken wire strands are bridging across the terminals. 6. Replace the Switch Covers and secure with the three screws removed in step 1. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 86 7. Secure the switches to the bracket on the Overhead assembly. Refer to the figures below Wiring removed for clarity. 8. Attach the 3-Phase Limit Switches to the Lift’s Overhead Assembly using the fasteners described below. Components removed for clarity. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 87 All wiring must be performed by a licensed Electrician in accordance with all local and national electrical codes. Make sure that main electrical power has been disconnected from the Lift and cannot be re-energized until all procedures are complete. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 88 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 89: Labels

    Labels 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 90 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 91 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 92: Parts Drawings

    Parts Drawings 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 93 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 94 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 95 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 96 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 97 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 98 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 99 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 100 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 101 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 102 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 103 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 104 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 105 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 106 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 107 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 108 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 109: Ali Store

    The ALI Store is your trusted source for workplace safety! Visit today and get the training and materials you need to work safely: www.autolift.org/ali-store/. 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 110: Maintenance Log

    Maintenance Log 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 111 Maintenance Log 16AP and 20AP Series Two-Post Lifts P/N 5900377 — Rev. A1—June 2024...
  • Page 112 30440 Agoura Road Agoura Hills, CA 91301 USA bendpak.com © 2024 by BendPak Inc. All rights reserved.

This manual is also suitable for:

16ap-19220ap20ap-192

Table of Contents