INSTALLATION & MAINTENANCE GUIDE Pro Junction Hub (Gen 5) - VAC-HUB6-PBK ® IMPORTANT SAFETY INSTRUCTIONS: READ BEFORE INSTALLATION This connection hub is intended for installation in accordance with local codes and the National Electric Code (NEC). Failure to adhere to these codes and instructions may result in serious injury, property damage and void the warranty.
Page 3
INSTALL TUBE Determine the desired location for mounting the stake. Hammer the stake Board into the ground until flange of stake is flush to grade. To avoid damage to the stake, place a board on top of the stake while hammering. Stake Note: If the ground is hard and the stake is difficult to...
Page 4
INSTALLATION & MAINTENANCE GUIDE Pro Junction Hub (Gen 5) - VAC-HUB6-PBK ® REMOVE TOP Remove the top from the hub. CONNECT WIRES Pigtail Connectors Hub Opening Open Hub Opening Lever Supply Cable Supply Cable from from fixtures transformer Put the supply cables from the transformer and the fixtures through the openings on the bottom of the hub.
Page 5
ATTACH TOP After all wires are connected, carefully pull the extra wire out of the bottom openings of the hub. Then, place the cover back onto the hub. 813.978.3900 • customersupport@amplighting.com • www.amplighting.com...
Need help?
Do you have a question about the Pro Junction Hub and is the answer not in the manual?
Questions and answers