Streifeneder ortho.production Plaster Silo 151M3 Instruction Manual

Streifeneder ortho.production Plaster Silo 151M3 Instruction Manual

Without/with rollers

Advertisement

Quick Links

Plaster Silo
151M3
150M3/F
Instruction Manual
without rollers
with rollers
151M3
ortho production

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Plaster Silo 151M3 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Streifeneder ortho.production Plaster Silo 151M3

  • Page 1 ortho production Plaster Silo 151M3 151M3 without rollers 150M3/F with rollers Instruction Manual...
  • Page 2 2/12...
  • Page 3: Table Of Contents

    Inhaltsverzeichnis Transport, storage and installation ..............4 Transport ..................... 4 I.II Storage ....................4 I.III Installation ................... 4 Introduction ....................5 General Information ................5 Safety Instructions ..................5 General Safety Instructions ..............5 Intended use ....................5 Technical data and equipment ............... 6 Scope of delivery, Transport, Storage and Assembly ........6 –...
  • Page 4: I Transport, Storage And Installation

    I Transport, storage and installation I.I Transport ATTENTION! Avoid sliding or tilting this product. Damage to the product could occur. ATTENTION! Risk of injury by lifting heavy loads. ATTENTION! Transport the product in its original packaging only. Secure the product with transport straps for transport. Do NOT lift or transport the product at the hand crank or the lid.
  • Page 5: Introduction

    • Proper personal protective equipment always has to be worn, with no exceptions. Streifeneder ortho.production GmbH assumes no liability for damage to property or personal injury resulting from the improper use of the product or failure to properly observe occupational safety regulations.
  • Page 6: Technical Data And Equipment

    4 Technical data and equipment 151M3 (without rollers) 151M3/F (with rollers) Dimensions W x D x H: 750 x 750 x 1320 mm 750 x 750 x 1405 mm Capacity: 340 litre / 320 kg 340 litre / 320 kg Conveyer screw: Ø...
  • Page 7: Installation

    5.4 Installation ATTENTION! The product must be mounted on level ground. ATTENTION! The product must be balanced out horizontally. ATTENTION! When balancing the product, please take care that your hands and feet do not get squeezed underneath the product. 6 Installation The device must be positioned on even ground.
  • Page 8: Commissioning

    7 Commissioning Open the easy-to-open lid until you reach the stop position. Two gas springs provide safe interlocking of the lid. Fill in the plaster, wearing a dust mask. To open plaster bags, you can use the opening device on top of the grate. The lid is fitted with a dust seal and must be closed after the plaster has been filled into the silo, in order to prevent debris from entering.
  • Page 9: Care And Maintenance And Service

    9 Care and maintenance and service 9.1 Housing Clean the outside of the device in regular intervals. Cleaning requires “normal” care only (dry sponge; soft, dry cloth, cold cleaning agent) – no chemical additives are needed. Excessive plaster as well as plaster dust may be removed by means of an industrial vacuum cleaner.
  • Page 10: Legal Warranty And Liability

    Legal Warranty and Liability For detailed information about our „Legal Warranty and Liability“ please see our general terms of sales and policies at: www.streifeneder.com/op/general-terms-and-conditions. 10/12...
  • Page 11 11/12...
  • Page 12 © copyright Streifeneder ortho.production 151M3/GGB V001 2023-05 Streifeneder ortho.production GmbH Moosfeldstraße 10 · 82275 Emmering/Germany T +49 8141 6106-0 · F +49 8141 6106-50 office@streifeneder.de · www.streifeneder.de/op...

This manual is also suitable for:

Plaster silo 150m3/f

Table of Contents