3. Make coarse (3/8 ) timing adjustments by moving the XCS chain ahead or back one tooth at a time on the
drive sprocket at the offload end of the machine.
4. Fine adjust the timing (within the last 3/8 ) by indexing the slotted drive sprocket on its hub.
5. Operate the conveyor and watch the interaction of the XCS plates and fixed rail pins through several
revolutions of the chain loops before moving the XCS into park position.
October 10, 2008
VITRONICS-SOLTEC REFLOW SOLDERING SYSTEMS
30
XPM2 / XPM3 Technical Reference Manual
Indexable XCS
drive sprocket
Conveyor Systems
Need help?
Do you have a question about the XPM2 and is the answer not in the manual?