A
C
12
B
D
S T E P 2
INSTALL
HANDLEBARS
Remove any packaging on the front of the bike, then
spin the handlebar stem 180º so that the stem and
forks are facing forward (A). Make sure that the forks
are the correct way around – the front brake caliper
should be on the left (non-drive) side of the bike, with
the fork arch facing forward.
Using a 4mm Allen key remove the faceplate
the stem and put the handlebars in place. Use the
guidelines printed on the handlebars to help position
them centrally and evenly. Check that the brake, gear
and dropper post cables have a nice flow and are not
kinked or twisted in any way.
Replace the faceplate of the stem and reinsert the
bolts, first by hand and then with the 4mm Allen Key.
This is a zero gap stem which means you need to
tighten the top two stem bolts until there is no gap
between the faceplate and the stem
tighten the two bottom bolts to snug.
To finish off use the 4mm Allen on the torque wrench
and torque the top two faceplate bolts to 5-7Nm and
then the bottom
two.(D)
(B)
of
(C)
and then
13
Need help?
Do you have a question about the PRIMER 29 EXPERT and is the answer not in the manual?