Page 1
Open Energy for All Hybrid/AC-coupled Inverter USER MANUAL HYT-5.0HV-EUG1 HYT-6.0HV-EUG1 HYT-8.0HV-EUG1 HYT-10.0HV-EUG1 HYT-12.0HV-EUG1 HAT-5.0HV-EUG1 HAT-6.0HV-EUG1 HAT-8.0HV-EUG1 HAT-10.0HV-EUG1 Region: Global REV2.2 hoymiles.com...
Safety instructions in this manual cannot cover all precautions that should be taken. Please consider the actual conditions on site when performing operations. Any damage caused by a violation of the safety instructions in this manual shall not be the responsibility of Hoymiles. Symbol...
If an error occurs, refer to troubleshooting or contact your local distributor or qualified electricians. 1.3 EU Declaration of Conformity Hoymiles Power Electronics Inc. hereby declares that the inverter described in this document is in compliance with the basic requirements and other relevant provisions of the following directives. •...
• Please refer to https://www.hoymiles.com for the compatible battery list, and the user should first contact Hoymiles for technical consultation and NOTICE obtain official confirmation prior to installing any battery not included in the official published list. 2.3.1 HYT-(5.0-12.0)HV-EUG1 The HYT-HV series inverter can be connected to a battery and PV panels to form a PV Energy Storage System (ESS).
The HYT-HV series inverter is compatible with any grid-connected PV inverter. With the addition of Hoymiles hybrid inverter, the existing PV system can be retrofitted to be a PV Energy Storage System (ESS) allowing more self-consumption energy and more backup energy.
• If the PV inverter is connected to the GEN port or EPS port, the power of the PV inverter shall be less than the rated output power of Hoymiles hybrid inverter. • If power export management is required, the power of the PV inverter shall be less than the battery charge power.
The HAT-HV series inverter is compatible with any grid-connected PV inverter. With the addition of Hoymiles AC-coupled inverter, the existing PV system can be retrofitted to be a PV Energy Storage System (ESS) allowing more self-consumption energy and more backup energy.
• If the PV inverter is connected to the GEN port or EPS port, the power of the PV inverter shall be less than the rated output power of Hoymiles AC-coupled inverter. • If power export management is required, the power of the PV inverter shall be less than the battery charge power.
NOTICE There is one smart meter in our packing box, and the other needs to be purchased from Hoymiles. The meter address is automatically set. If there are meter communication problems, please check if the address of the PV side meter is set to 1, and the address of the grid side meter is set to 2.
Earth Fault Alarm, Load Control, and Generator Control. The DO2 can control the external bypass contactor if used, and for more information, please contact Hoymiles technical support team. The connection method is the same as that described in “3.4.5.3 DRM...
System Power-off Procedure Step 1 Stop the inverter from working via the Hoymiles App. Step 2 Disconnect the AC breaker between the inverter and the grid. (Only for HYT series inverters) Rotate the DC switch to “OFF” if the inverter is connected to Step 3 the PV strings.
S-Miles End-user 3.5.3.1 DTS Online Setting 1. Search “Hoymiles” in the App Store (iOS) or the Play Store (Android), or scan the QR code to download the Hoymiles Installer App. 2. Open the app and log in with your installer account and password. For new Hoymiles installers, please apply for an installer account from your distributor in advance.
Page 60
S-Miles Installer S-Miles End-user Floor 6-10, Building 5, 99 Housheng Road, Gongshu District, Hangzhou 310015 P. R. China +86 571 2805 6101 General inquiry: info@hoymiles.com Technical support: service@hoymiles.com Visit https://www.hoymiles.com/ for more information.
Need help?
Do you have a question about the HYT-5.0HV-EUG1 and is the answer not in the manual?
Questions and answers