Wittkopp Anchor Installation And Commissioning Instructions

Installer manual input unit
Hide thumbs Also See for Anchor:

Advertisement

Quick Links

Anchor / Primor
Installer manual input unit
Installation and commissioning instructions
Note:
On the cover sheet you can find warning information, and an explanation of the symbols and
terms used, together with the exclusion of liability.
Contents
General ................................................................................................................................. 2
Installation ............................................................................................................................. 3
Input unit Anchor LC ......................................................................................................... 3
Preparation for installation ............................................................................................. 3
Input unit Primor RE .......................................................................................................... 5
Preparation for installation ............................................................................................. 5
Cable guidance / plug position ....................................................................................... 6
Installation ..................................................................................................................... 6
Input unit Primor FE ........................................................................................................... 7
Preparation for installation ............................................................................................. 7
Cable guidance / plug position ....................................................................................... 7
Installation ..................................................................................................................... 8
Input Unit Primor RO ......................................................................................................... 9
Preparation for installation ............................................................................................. 9
Cable guidance / plug position ......................................................................................11
Installation ....................................................................................................................11
Input unit Primor FL ..........................................................................................................13
Preparation for installation ............................................................................................13
Cable guidance / plug position ......................................................................................14
Input unit Primor FS ..........................................................................................................15
Preparation for installation ............................................................................................15
Cable guidance / plug position ......................................................................................15
Function test .........................................................................................................................16
Keypad test ......................................................................................................................16
Battery change .....................................................................................................................17
02 en_APxxx-Teil 2a-Errichterhandbuch Tastatur V2.05.docx
1 / 17

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Anchor and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Wittkopp Anchor

  • Page 1: Table Of Contents

    Contents General ..........................2 Installation ..........................3 Input unit Anchor LC ......................3 Preparation for installation ..................... 3 Input unit Primor RE ......................5 Preparation for installation ..................... 5 Cable guidance / plug position ..................6 Installation ........................
  • Page 2: General

    Anchor / Primor Installer manual input unit Installation and commissioning instructions General In principle, all locks in these series can be Also conceivable is the bolt drive via a operated with input units from the Primor separate handle or rotary knob operated via and Anchor series.
  • Page 3: Installation

    Anchor / Primor Installer manual input unit Installation and commissioning instructions Installation Input unit Anchor LC Preparation for installation Drill a through-hole of Ø 8mm, max. Clean the adhesive surface for the input 11.4mm for the wiring in the door, make unit free of dust, oil, release agents and sure there are no burrs on both sides.
  • Page 4 Anchor / Primor Installer manual input unit Installation and commissioning instructions Note on dismantling / emergency power supply: To dismantle the input unit, insert a Do not damage the cables underneath. screwdriver of the appropriate size into the For an emergency power supply, first groove of the input unit (pos.
  • Page 5: Input Unit Primor Re

    Anchor / Primor Installer manual input unit Installation and commissioning instructions Input unit Primor RE Preparation for installation Drill four M5 threaded holes with sufficient The square axis requires a minimum thread depth and one through hole (cable diameter of 10.6mm.
  • Page 6: Cable Guidance / Plug Position

    Anchor / Primor Installer manual input unit Installation and commissioning instructions Cable guidance / plug position Lead the connection cable through the Connect the plug of the cable with the plug Spindle. Push the cable and the O-ring in on the circuit board.
  • Page 7: Input Unit Primor Fe

    Anchor / Primor Installer manual input unit Installation and commissioning instructions Input unit Primor FE Preparation for installation From the front 3 threaded holes M5 with 1 through-hole (opening for cable/Spindle) sufficient thread depth and have to be drilled into the safe door.
  • Page 8: Installation

    Anchor / Primor Installer manual input unit Installation and commissioning instructions Installation Fix the input unit from the front with the Install covering caps battery enclosed cylinder screws M5. compartment cover. 02 en_APxxx-Teil 2a-Errichterhandbuch Tastatur V2.05.docx 8 / 17...
  • Page 9: Input Unit Primor Ro

    Anchor / Primor Installer manual input unit Installation and commissioning instructions Input Unit Primor RO Preparation for installation From the front 4 threaded holes M4 with Two axle versions are available for this sufficient thread depth and 1 through-hole type. A square axle is used as standard,...
  • Page 10 35mm. (tolerance -3mm) Primor 2000: L=A +43 mm (tolerance -4mm) L = A + 43 mm Anchor 2600: L= A+35mm (tolerance -3mm) 02 en_APxxx-Teil 2a-Errichterhandbuch Tastatur V2.05.docx 10 / 17...
  • Page 11: Cable Guidance / Plug Position

    Anchor / Primor Installer manual input unit Installation and commissioning instructions Cable guidance / plug position Lead the connection cable through the behind. Then plug the cable into the socket spindle and insert it into the input unit from on the printed circuit board.
  • Page 12 Anchor / Primor Installer manual input unit Installation and commissioning instructions Mount the input unit with an angle of Turn the input unit to the right into position. approx. 20° to the fixing ring. (Position 1). The turning has to happen easily.
  • Page 13: Input Unit Primor Fl

    Anchor / Primor Installer manual input unit Installation and commissioning instructions Input unit Primor FL Preparation for installation Depending on the version, assembly is Two through-holes for M5 screws and also done from the outside or from the inside. one through-hole (cable outlet) in the safe...
  • Page 14: Cable Guidance / Plug Position

    Anchor / Primor Installer manual input unit Installation and commissioning instructions Battery compartment: Battery sliding compartment: The rear battery contacts are exposed in the battery drawer. To avoid a short circuit/self- discharge, the connections of the battery compartment must not touch other components.
  • Page 15: Input Unit Primor Fs

    Anchor / Primor Installer manual input unit Installation and commissioning instructions Input unit Primor FS Preparation for installation From the front, drill two M5 threaded holes The drilling diameter for the through hole with sufficient thread depth and a through may not exceed the maximum of 11.4 mm.
  • Page 16: Function Test

    Anchor / Primor Installer manual input unit Installation and commissioning instructions Function test In principle, only the electronic function of The function of the overall system in each of the input units listed can be carried connection with the lock and boltwork can...
  • Page 17: Battery Change

    To change the battery, slide the battery compartment open in the direction of the arrow: When using the Primor FL and Anchor LC The battery in the sliding compartment is in type keyboards, i.e. systems with battery a plastic holder.

This manual is also suitable for:

Primor

Table of Contents