10.3 Maintenance before a long stop period

10.4 Maintenance after a long stop period

10.5 About the refrigerant

Installer and user reference guide
32
3 Clean the air filters. Use a vacuum cleaner or wash with water. If the air filter
is very dirty, use a soft brush and neutral detergent.
4 Dry the air filters in the shadow.
5 Reattach the air filters and close panel.
6 Turn ON the power.
7 To remove warning screens, see the reference guide of the user interface.
E.g., at the end of the season.
Let the indoor units run in fan only operation for about half a day in order to dry
the interior of the units.
Clean air filters and casings of indoor units (see
4
and air
filter" [
 31]).
Turn off the power. The user interface display disappears. When the main power
is turned on, the air conditioner will use some power, even if it is not operating.
Remove the batteries from the user interface (if applicable).
E.g., at the beginning of the season.
Check and remove everything that might be blocking inlet and outlet vents of
indoor units and outdoor units.
Clean air filters and casings of indoor units (see
4
and air
filter" [
 31]).
Turn on the power at least 6 hours before operating the system in order to
ensure smoother operation. As soon as the power is turned on, the user
interface display appears.
Insert batteries in the user interface (if applicable).
This product contains fluorinated greenhouse gases. Do NOT vent gases into the
atmosphere.
Refrigerant type: R410A
Global warming potential (GWP) value: 2087.5