Initial Commissioning - Miele PDR 514 Operating And Installation Instructions

Commercial tumble dryers
Table of Contents

Advertisement

Initial commissioning

18
 Risk of injury or damage to property due to improper installation.
Incorrect installation of the tumble dryer can lead to personal injury
or damage to property.
Before commissioning the tumble dryer for the first time, make sure
it has been installed correctly.
Connect the tumble dryer correctly.
Please follow the instructions in "Installation".
Complete the initial commissioning process. During the initial com-
missioning process, you will need to define the settings for daily use
of the tumble dryer. Some settings can only be modified during the
initial commissioning process. After that, they can only be changed
by the Miele Customer Service Department.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pdr 518Pdr 522Pdr 528Pdr 544

Table of Contents