Initial Commissioning; Downtime After Installation - Miele TWB120WPT1 Operating Instructions Manual

Heat-pump
Table of Contents

Advertisement

Downtime after installation

Damage caused by switching the
appliance on too soon.
This can damage the heat pump.
After setting up the tumble dryer,
wait for at least one hour before
starting a drying program.
Removing the protective foil
and stickers
 Remove:
- any protective film from the door
- any stickers from the front and the lid
Please do not remove any labels
(e.g. the data plate) which are visible
when you open the door.
Carrying out the procedure for
initial commissioning outlined
in these instructions
 Read "1. Notes on correct laundry
care" and "2. Loading the tumble
dryer".
 You can then load the tumble dryer
and select a program as described in
"3. Selecting a program and starting
it".

Initial commissioning

19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Twb120wp

Table of Contents